My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2015 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0518
>
10A Action 2015 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:58:41 AM
Creation date
5/13/2015 9:41:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0518 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
PowerPoint 10A Action 2015 0518 Bayfair Transit Village
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
Reso 2015-098
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
MTC/City of San Leandro <br />Bay Fair BART Transit Village Specific Plan EIR Funding Agreement <br />Page 6 <br />Task 5: Alternatives Analysis <br />The consultant will prepare a minimum of three draft long-term alternatives or visions for the <br />TOD/PDA plan, assess the feasibility of implementing each alternative with a focus on the <br />identified opportunity sites. Supporting maps (i.e., land use, circulation, density/form) for each <br />alternative must be included. Photo -simulations and visual massing studies are highly <br />recommended for each alternative if feasible, but are required for the preferred option. The <br />alternatives should include an analysis of potentially incompatible land uses and resulting <br />consequences/issues. For the purpose of policy discussion and environmental assessment, the <br />alternatives will contrast different land use compositions and development intensities. A detailed <br />breakdown of the development potential under each land use alternative will be prepared. The <br />consultant will also prepare preliminary pro forma analyses to test the feasibility of specific <br />development options on key opportunity sites, including an assessment of incentives and other <br />policies required to meet the housing needs identified in Tasks 3 and 4 above. Staff and <br />consultant will solicit input from interested developers to test the market and financial feasibility <br />of the land use alternatives. <br />The PDA Profile Report, Community Involvement Strategy, Alternatives Analysis and Market <br />Demand Analysis will be presented at a community workshop for public education and initial <br />feedback. Following public input and based on the findings of the Alternatives Analysis, a <br />Preferred (Development) Alternative will be identified. <br />Deliverable #5a: Alternatives Analysis Memo <br />Deliverable#5b: TAC Meeting—Agenda/Meeting Materials and Minutes <br />Deliverable#5c: CAC Meeting—Agenda/Meeting Materials and Minutes <br />Deliverable #Sd: Community Workshop - Agenda/Meeting Materials and Summary of <br />Feedback <br />Task 6: Multi -modal Access and Connectivity <br />This plan or report will identify pedestrian access and circulation patterns, bicycle access and <br />circulation plans, transit connectivity, and auto circulation routes. The consultant will prepare <br />strategies for transportation demand management (TDM) improving bus access to rail stations <br />and frequency of feeder services (in consultation with transit providers) as well as pedestrian, <br />bicycle and auto access and safety. Multi -modal connections between the transit stations and <br />higher density housing, surrounding neighborhood amenities, activity nodes (including outside of <br />the planning area), and open space should be emphasized. Opportunities for new and/or <br />improved non -auto connections should be identified. <br />Deliverable #6a: Multi -modal Access and Connectivity Planl Mlemo <br />Task 7: Pedestrian -friendly Design/Placemaking & Accessible Design Guidelines <br />
The URL can be used to link to this page
Your browser does not support the video tag.