Laserfiche WebLink
EXHIBIT A <br /> Anticipated meetings and outreach activities are as follows.City staff will prepare staff reports for June 2015 — June <br /> the following meetings with assistance from R+A. R+A will prepare, in coordination with City staff, 2017 <br /> any visual (e.g., Powerpoint presentations) or written materials for the meetings below when <br /> applicable. Material may be drawn from deliverables created in other tasks. <br /> • MCE 1.1 Technical Advisory Committee (TAC). The focus of the TAC will be to provide <br /> technical feedback during the project. The flow of meetings between the TAC and CAC <br /> and the deliverables discussed will be parallel and may happen sequentially or <br /> concurrently, though the topical focus and level of technical discussion will likely differ <br /> between the TAC and CAC. There will be 4 TAC meetings as follows: <br /> o Meeting 1: Project overview/input that may include Community Involvement <br /> Strategy, PDA Profile, Market Demand Analysis, and Affordable Housing & <br /> Displacement Strategy. <br /> o Meeting 2: Review of potential plan scenarios (created in Task 2.2) and input on <br /> the preferred alternative. <br /> o Meeting 3: Review of and input on preferred alternative, plan framework, and/or <br /> Draft Plan, which may include land use, multi-modal connectivity, pedestrian- <br /> friendly design standards, and accessible design strategies as necessary. <br /> o Meeting 4: Review of public draft or adoption draft plan, and input on any <br /> refinements or additional details necessary. This may also include review of <br /> public comments on the Draft Plan. <br /> • MCE 1.2 Citizens Advisory Committee (CAC). The focus of the CAC will be to provide a <br /> focused community stakeholder perspective during the project. There will be 4 CAC <br /> meetings as follows. <br /> o Meeting 1: Project overview/input that may include Community Involvement <br /> Strategy, PDA Profile, Market Demand Analysis, Affordable Housing Strategy. <br /> o Meeting 2: Review of potential plan scenarios (created in Task 2.2) and input on <br /> the preferred alternative. <br /> o Meeting 3: Review of and input on preferred alternative, plan framework, and/or <br /> Draft Plan, which may include land use, multi-modal connectivity, pedestrian- <br /> friendly design standards, and accessible design strategies as necessary. <br /> RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 I PAGE A-19 <br />