PROJECT TITLE: APS Upgrade 2012
<br />PROJECT NO.: 2012.0220
<br />BID NO.: 14-15.019
<br />BID SUMMARY
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An award
<br />of contract, if any, is subject to approval of the City Council and/or the City Manager.
<br />Contractors should refer to the contract documents for bidding information.
<br />BID OPENING
<br />DATE: Tuesday, May 12, 2015
<br />TIME: 2:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 5/6/2015
<br />Prepared by: N. Castelino
<br />RL Chen
<br />Tennyson Electric, Inc.
<br />7275 National Drive, A-2
<br />Livermore, CA 94550
<br />Phone: (925) 606-1038
<br />Fax: (925) 606-7655
<br />Mike Brown Electric Co.
<br />561-A Mercantile Drive
<br />Cotati, CA 94931
<br />Phone: (707) 792-8100
<br />Fax: (707) 792-8110
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Install curb and gutter per drawing
<br />750 LF
<br />$55.00
<br />$41,250.00
<br />$140.00
<br />$105,000.00
<br />$51,750.00
<br />$38,812,500.00
<br />100 case 3101
<br />2
<br />Install sidewalk per drawing 100
<br />1200 SF
<br />$15.00
<br />$18,000.00
<br />$14.00
<br />$16,800.00
<br />$15,900.00
<br />$19,080,000.00
<br />case 3101
<br />3
<br />Install wheelchair curb cut ramp
<br />5000 SF
<br />$15.00
<br />$75,000.00
<br />$25.00
<br />$125,000.00
<br />$92,500.00
<br />$462,500,000.00
<br />per drawing 106A and B case
<br />3101
<br />4
<br />Install valley gutter per drawing
<br />500 SF
<br />$20.00
<br />$10,000.00
<br />$21.50
<br />$10,750.00
<br />$13,000.00
<br />$6,500,000.00
<br />114 case 3101
<br />5
<br />Provide Traffic Control plan and
<br />18 ST
<br />$800.00
<br />$14,400.00
<br />$6,250.00
<br />$112,500.00
<br />$100,000.00
<br />$1,800,000.00
<br />implement traffic control per
<br />section 7-10.3.3 and 7-10.3.4
<br />6
<br />Furnish and Install Sleeve and
<br />0 EA
<br />$150.00
<br />$0.00
<br />$1,500.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />Advanced Unistruct Sign Pole per
<br />Sheet 15
<br />7
<br />Furnish and Install foundation of
<br />2 EA
<br />$2,480.00
<br />$4,960.00
<br />$1,500.00
<br />$3,000.00
<br />$1,800.00
<br />$3,600.00
<br />1 B Pole per Sheet 15
<br />8
<br />Install City Provided TAPCO
<br />2 EA
<br />$1,000.00
<br />$2,000.00
<br />$2,450.00
<br />$4,900.00
<br />$6,200.00
<br />$12,400.00
<br />RRFB System per Sheet 15
<br />9
<br />Install traffic sign and Pole per
<br />2 EA
<br />$95.00
<br />$190.00
<br />$1,200.00
<br />$2,400.00
<br />$1,000.00
<br />$2,000.00
<br />10
<br />Remove Existing Sign and Pole
<br />2 EA
<br />$100.00
<br />$200.00
<br />$250.00
<br />$500.00
<br />$100.00
<br />$200.00
<br />per Sheet 15
<br />11
<br />Furnish and Install Sign Pole,
<br />1 EA
<br />$9,000.00
<br />$9,000.00
<br />$5,008.00
<br />$5,008.00
<br />$3,000.00
<br />$3,000.00
<br />Speed Feedback Sign, and R2-
<br />1(35) Sign per Sheet 18
<br />12
<br />Cast in Place domes
<br />25 EA
<br />$800.00
<br />$20,000.00
<br />$1,640.00
<br />$41,000.00
<br />$30,000.00
<br />$750,000.00
<br />Bid Summary - APS Upgrade 2012 Page 4 of 6 Printed 5/13/2015 @ 8:33 AM
<br />
|