Laserfiche WebLink
PROJECT TITLE: APS Upgrade 2012 <br />PROJECT NO.: 2012.0220 <br />BID NO.: 14-15.019 <br />BID SUMMARY <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An award <br />of contract, if any, is subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Tuesday, May 12, 2015 <br />TIME: 2:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 5/6/2015 <br />Prepared by: N. Castelino <br />RL Chen <br />Tennyson Electric, Inc. <br />7275 National Drive, A-2 <br />Livermore, CA 94550 <br />Phone: (925) 606-1038 <br />Fax: (925) 606-7655 <br />Mike Brown Electric Co. <br />561-A Mercantile Drive <br />Cotati, CA 94931 <br />Phone: (707) 792-8100 <br />Fax: (707) 792-8110 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Install curb and gutter per drawing <br />750 LF <br />$55.00 <br />$41,250.00 <br />$140.00 <br />$105,000.00 <br />$51,750.00 <br />$38,812,500.00 <br />100 case 3101 <br />2 <br />Install sidewalk per drawing 100 <br />1200 SF <br />$15.00 <br />$18,000.00 <br />$14.00 <br />$16,800.00 <br />$15,900.00 <br />$19,080,000.00 <br />case 3101 <br />3 <br />Install wheelchair curb cut ramp <br />5000 SF <br />$15.00 <br />$75,000.00 <br />$25.00 <br />$125,000.00 <br />$92,500.00 <br />$462,500,000.00 <br />per drawing 106A and B case <br />3101 <br />4 <br />Install valley gutter per drawing <br />500 SF <br />$20.00 <br />$10,000.00 <br />$21.50 <br />$10,750.00 <br />$13,000.00 <br />$6,500,000.00 <br />114 case 3101 <br />5 <br />Provide Traffic Control plan and <br />18 ST <br />$800.00 <br />$14,400.00 <br />$6,250.00 <br />$112,500.00 <br />$100,000.00 <br />$1,800,000.00 <br />implement traffic control per <br />section 7-10.3.3 and 7-10.3.4 <br />6 <br />Furnish and Install Sleeve and <br />0 EA <br />$150.00 <br />$0.00 <br />$1,500.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Advanced Unistruct Sign Pole per <br />Sheet 15 <br />7 <br />Furnish and Install foundation of <br />2 EA <br />$2,480.00 <br />$4,960.00 <br />$1,500.00 <br />$3,000.00 <br />$1,800.00 <br />$3,600.00 <br />1 B Pole per Sheet 15 <br />8 <br />Install City Provided TAPCO <br />2 EA <br />$1,000.00 <br />$2,000.00 <br />$2,450.00 <br />$4,900.00 <br />$6,200.00 <br />$12,400.00 <br />RRFB System per Sheet 15 <br />9 <br />Install traffic sign and Pole per <br />2 EA <br />$95.00 <br />$190.00 <br />$1,200.00 <br />$2,400.00 <br />$1,000.00 <br />$2,000.00 <br />10 <br />Remove Existing Sign and Pole <br />2 EA <br />$100.00 <br />$200.00 <br />$250.00 <br />$500.00 <br />$100.00 <br />$200.00 <br />per Sheet 15 <br />11 <br />Furnish and Install Sign Pole, <br />1 EA <br />$9,000.00 <br />$9,000.00 <br />$5,008.00 <br />$5,008.00 <br />$3,000.00 <br />$3,000.00 <br />Speed Feedback Sign, and R2- <br />1(35) Sign per Sheet 18 <br />12 <br />Cast in Place domes <br />25 EA <br />$800.00 <br />$20,000.00 <br />$1,640.00 <br />$41,000.00 <br />$30,000.00 <br />$750,000.00 <br />Bid Summary - APS Upgrade 2012 Page 4 of 6 Printed 5/13/2015 @ 8:33 AM <br />