<br />PROJECT TITLE: APS Upgrade 2012
<br />PROJECT NO.: 2012.0220
<br />BID NO.: 14-15.019
<br />BID SUMMARY
<br />is document is a summary of bids received for the subject project and are
<br />:)vided only as a convenience. Listing of a particular bid is not a finding that such
<br />I has been found to be responsive or accepted as complete by the City. An award
<br />contract, if any, is subject to approval of the City Council and/or the City Manager.
<br />mtractors should refer to the contract documents for bidding information.
<br />BID OPENING
<br />DATE: Tuesday, May 12, 2015
<br />TIME: 2:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 5/6/2015
<br />Prepared by: N. Castelino
<br />RL Chen
<br />Tennyson Electric, Inc.
<br />7275 National Drive, A-2
<br />Livermore, CA 94550
<br />Phone: (925) 606-1038
<br />Fax: (925) 606-7655
<br />Mike Brown Electric Co.
<br />561-A Mercantile Drive
<br />Cotati, CA 94931
<br />Phone: (707) 792-8100
<br />Fax: (707) 792-8110
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />13
<br />Install Vertical Curb per drawing
<br />300 LF
<br />$30.00
<br />$9,000.00
<br />$111.00
<br />$33,300.00
<br />$11,400.00
<br />$3,420,000.00
<br />100 case 3101
<br />14
<br />Furnish and Install 4 -ft Pedestrian
<br />19 EA
<br />$553.00
<br />$10,507.00
<br />$2,722.00
<br />$51,718.00
<br />$12,350.00
<br />$234,650.00
<br />Push Button Pole
<br />15
<br />Furnish and Install 2" Conduit and
<br />190 LF
<br />$40.00
<br />$7,600.00
<br />$40.00
<br />$7,600.00
<br />$17,100.00
<br />$3,249,000.00
<br />2#14 Conductor
<br />16
<br />Install City Provided APS System
<br />1 LS
<br />$22,500.00
<br />$22,500.00
<br />$36,750.00
<br />$36,750.00
<br />$92,264.00
<br />$92,264.00
<br />and Push Buttons, including APS
<br />Control Unit, Pushbutton Station,
<br />and Hand -Held Configurator, at
<br />15 Intersections
<br />17
<br />Stamped Colored Concrete
<br />100 SF
<br />$20.00
<br />$2,000.00
<br />$49.00
<br />$4,900.00
<br />$3,300.00
<br />$330,000.00
<br />18
<br />Striping including areas requiring
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$34,450.00
<br />$34,450.00
<br />$22,500.00
<br />$22,500.00
<br />removal
<br />19
<br />Remove P.PB poles and buttons
<br />6 EA
<br />$300.00
<br />$1,800.00
<br />$600.00
<br />$3,600.00
<br />$3,000.00
<br />$18,000.00
<br />20
<br />Relocate Type 1B poles
<br />4 EA
<br />$1,000.00
<br />$4,000.00
<br />$5,250.00
<br />$21,000.00
<br />$6,800.00
<br />$27,200.00
<br />21
<br />Bolt on plates
<br />30 EA
<br />$50.00
<br />$1,500.00
<br />$150.00
<br />$4,500.00
<br />$6,450.00
<br />$193,500.00
<br />22
<br />Furnish and Install No. 5 Pull Box
<br />1 EA
<br />$400.00
<br />$400.00
<br />$900.00
<br />$900.00
<br />$370.00
<br />$370.00
<br />23
<br />Furnish and Install AC Pavement
<br />35 TONS
<br />$200.00
<br />$7,000.00
<br />$850.00
<br />$29,750.00
<br />$11,515.00
<br />$403,025.00
<br />at Median Island Removal Area
<br />24
<br />Furnish and Install Type 1
<br />10 LF
<br />$100.00
<br />$1,000.00
<br />$900.00
<br />$9,000.00
<br />$1,500.00
<br />$15,000.00
<br />Barricade per Sheet 7
<br />25
<br />Relocate 4 -ft Pedestrian Push
<br />3 EA
<br />$700.00
<br />$2,100..00
<br />$2,650.00
<br />$7,950.00
<br />$2,475.00
<br />$7,425.00
<br />Button Pole per Sheet 7
<br />26
<br />Relocate street light pole per
<br />1 EA
<br />$1,000.00
<br />$1,000.00
<br />$3,200.00
<br />$3,200.00
<br />$1,600.00
<br />$1,600.00
<br />Sheet 17
<br />27
<br />Furnish and Install Detector
<br />17 EA
<br />$600.00
<br />$10,200.00
<br />$465.00
<br />$7,905.00
<br />$6,800.00
<br />$115,600.00
<br />Loops
<br />Bid Summary - APS Upgrade 2012 Page 5 of 6 Printed 5/13/2015 @ 8:33 AM