Laserfiche WebLink
S�Ni,,¢2 smZo. <br />H <br />6�FARhiEQ,f <br />PROJECT TITLE: APS Upgrade 2012 <br />PROJECT NO.: 2012.0220 <br />BID NO.: 14-15.019 <br />BID SUMMARY <br />is document is a summary of bids received for the subject project and are <br />:)vided only as a convenience. Listing of a particular bid is not a finding that such <br />I has been found to be responsive or accepted as complete by the City. An award <br />contract, if any, is subject to approval of the City Council and/or the City Manager. <br />mtractors should refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Tuesday, May 12, 2015 <br />TIME: 2:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 5/6/2015 <br />Prepared by: N. Castelino <br />RL Chen <br />Tennyson Electric, Inc. <br />7275 National Drive, A-2 <br />Livermore, CA 94550 <br />Phone: (925) 606-1038 <br />Fax: (925) 606-7655 <br />Mike Brown Electric Co. <br />561-A Mercantile Drive <br />Cotati, CA 94931 <br />Phone: (707) 792-8100 <br />Fax: (707) 792-8110 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />13 <br />Install Vertical Curb per drawing <br />300 LF <br />$30.00 <br />$9,000.00 <br />$111.00 <br />$33,300.00 <br />$11,400.00 <br />$3,420,000.00 <br />100 case 3101 <br />14 <br />Furnish and Install 4 -ft Pedestrian <br />19 EA <br />$553.00 <br />$10,507.00 <br />$2,722.00 <br />$51,718.00 <br />$12,350.00 <br />$234,650.00 <br />Push Button Pole <br />15 <br />Furnish and Install 2" Conduit and <br />190 LF <br />$40.00 <br />$7,600.00 <br />$40.00 <br />$7,600.00 <br />$17,100.00 <br />$3,249,000.00 <br />2#14 Conductor <br />16 <br />Install City Provided APS System <br />1 LS <br />$22,500.00 <br />$22,500.00 <br />$36,750.00 <br />$36,750.00 <br />$92,264.00 <br />$92,264.00 <br />and Push Buttons, including APS <br />Control Unit, Pushbutton Station, <br />and Hand -Held Configurator, at <br />15 Intersections <br />17 <br />Stamped Colored Concrete <br />100 SF <br />$20.00 <br />$2,000.00 <br />$49.00 <br />$4,900.00 <br />$3,300.00 <br />$330,000.00 <br />18 <br />Striping including areas requiring <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$34,450.00 <br />$34,450.00 <br />$22,500.00 <br />$22,500.00 <br />removal <br />19 <br />Remove P.PB poles and buttons <br />6 EA <br />$300.00 <br />$1,800.00 <br />$600.00 <br />$3,600.00 <br />$3,000.00 <br />$18,000.00 <br />20 <br />Relocate Type 1B poles <br />4 EA <br />$1,000.00 <br />$4,000.00 <br />$5,250.00 <br />$21,000.00 <br />$6,800.00 <br />$27,200.00 <br />21 <br />Bolt on plates <br />30 EA <br />$50.00 <br />$1,500.00 <br />$150.00 <br />$4,500.00 <br />$6,450.00 <br />$193,500.00 <br />22 <br />Furnish and Install No. 5 Pull Box <br />1 EA <br />$400.00 <br />$400.00 <br />$900.00 <br />$900.00 <br />$370.00 <br />$370.00 <br />23 <br />Furnish and Install AC Pavement <br />35 TONS <br />$200.00 <br />$7,000.00 <br />$850.00 <br />$29,750.00 <br />$11,515.00 <br />$403,025.00 <br />at Median Island Removal Area <br />24 <br />Furnish and Install Type 1 <br />10 LF <br />$100.00 <br />$1,000.00 <br />$900.00 <br />$9,000.00 <br />$1,500.00 <br />$15,000.00 <br />Barricade per Sheet 7 <br />25 <br />Relocate 4 -ft Pedestrian Push <br />3 EA <br />$700.00 <br />$2,100..00 <br />$2,650.00 <br />$7,950.00 <br />$2,475.00 <br />$7,425.00 <br />Button Pole per Sheet 7 <br />26 <br />Relocate street light pole per <br />1 EA <br />$1,000.00 <br />$1,000.00 <br />$3,200.00 <br />$3,200.00 <br />$1,600.00 <br />$1,600.00 <br />Sheet 17 <br />27 <br />Furnish and Install Detector <br />17 EA <br />$600.00 <br />$10,200.00 <br />$465.00 <br />$7,905.00 <br />$6,800.00 <br />$115,600.00 <br />Loops <br />Bid Summary - APS Upgrade 2012 Page 5 of 6 Printed 5/13/2015 @ 8:33 AM <br />