ardRnII NAY 4l�� rr.+ew +xna ,;�^
<br />PROJECT TITLE: Annual Overlay/Rehabilitation 2014-15
<br />PROJECT NO.: 2015.0050
<br />BID NO.: 14-15.018
<br />BID SUMMARY
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />BID OPENING ENGINEER'S ESTIMATE Gallagher & Burk, Inc.
<br />DATE: Thursday, May 21, 2015 Date Approved: 5/21/2015 344 High Street
<br />TIME: 3:00 p.m. Prepared by: M. Goratka Oakland, CA 94601
<br />LOCATION: City Clerk's Office Phone: (510) 261-0466
<br />Fax: (510) 261-0475
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />I ITEM COST
<br />BASE BID
<br />1
<br />Mobilization per Section 9-3.4
<br />1 LS
<br />$62,283.20
<br />$62,283.20
<br />$100,000.00
<br />$100,000.00
<br />2
<br />Traffic and Pedestrian Control and
<br />1 LS
<br />$40,000.00
<br />$40,000.00
<br />$65,000.00
<br />$65,000.00
<br />Construction Signage per Section 7-10
<br />3
<br />Adjust Sanitary Sewer Manhole Frame
<br />8 EA
<br />$1,500.00
<br />$12,000.00
<br />$2,000.00
<br />$16,000.00
<br />and Cover to Grade per Section 301-
<br />4
<br />Remove and Rebuild City Monument
<br />5 EA
<br />$1,500.00
<br />$7,500.00
<br />$2,000.00
<br />$10,000.00
<br />per City Standard Plan No. 309
<br />5
<br />AC Milling and Offhaul (Final Quantity)
<br />1870 CY
<br />$55.00
<br />$102,850.00
<br />$70.00
<br />$130,900.00
<br />per Section 302-1
<br />6
<br />Potholing per Section 306-0
<br />315 EA
<br />$250.00
<br />$78,750.00
<br />$200.00
<br />$63,000.00
<br />7
<br />Curb Cut Ramps per City Standard
<br />615 SF
<br />$16.00
<br />$9,840.00
<br />$16.00
<br />$9,840.00
<br />Plan 106A/B
<br />8
<br />Curb and Gutter per City Standard
<br />260 LF
<br />$55.00
<br />$14,300.00
<br />$60.00
<br />$15,600.00
<br />Plan 100
<br />9
<br />8" Concrete Slab per City Std Plan 114
<br />120 SF
<br />$20.00
<br />$2,400.00
<br />$16.00
<br />$1,920.00
<br />10
<br />Sheeting, shoring, and bracing per
<br />1 LS
<br />$500.00
<br />$500.00
<br />$5,000.00
<br />$5,000.00
<br />section 306-1.1.6
<br />11
<br />10" O C900 Storm Drain per Section
<br />110 LF
<br />$50.00
<br />$5,500.00
<br />$180.00
<br />$19,800.00
<br />12
<br />Storm Water Inlet at Sta. 9+19 per City
<br />1 EA
<br />$2,500.00
<br />$2,500.00
<br />$3,000.00
<br />$3,000.00
<br />Std Plan 204
<br />13
<br />Storm Water Inlet at Sta. 10+15 per
<br />1 EA
<br />$3,000.00
<br />$3,000.00
<br />$3,000.00
<br />$3,000.00
<br />City Std Plan 204
<br />14
<br />Storm Water Inlet Modification per
<br />1 LS
<br />$4,000.00
<br />$4,000.00
<br />$3,000.00
<br />$3,000.00
<br />Detail 3, Sheet 8.
<br />Bid Summary - Annual Overlay Rehab 2014-15 Page 1 of 3 Printed 5/21/2015 @ 3:36 PM