Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Annual Overlay/Rehabilitation 2014-15 <br />PROJECT NO.: 2015.0050 <br />BID NO.: 14-15.018 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Gallagher & Burk, Inc. <br />DATE: Thursday, May 21, 2015 <br />Date Approved: 5/21/2015 <br />344 High Street <br />TIME: 3:00 p.m. <br />Prepared by: M. Goralka <br />Oakland, CA 94601 <br />LOCATION: City Clerk's Office <br />Phone: (510) 261-0466 <br />Fax: (510) 261-0475 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />15 <br />Cement for Soil Stabilization per <br />525 TN <br />$120.00 <br />$63,000.00 <br />$125.00 <br />$65,625.00 <br />Section 201-1 <br />16 <br />Soil Stabilization (Equipment & Labor <br />92150 SF <br />$1.00 <br />$92,150.00 <br />$1.20 <br />$110,580.00 <br />Only) per Section 301-3 <br />17 <br />Soil Stabilization at Locations with <br />17500 SF <br />$2.00 <br />$35,000.00 <br />$1.50 <br />$26,250.00 <br />Shallow Utilities (Equipment & Labor <br />Only) per Section 301-3.4 <br />18 <br />Asphalt Concrete Paving per Section <br />2040 TN <br />$85.00 <br />$173,400.00 <br />$105.00 <br />$214,200.00 <br />302-5 <br />19 <br />Thermoplastic Stripes, Pavement <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$2,000.00 <br />$2,000.00 <br />Markings and Markers per Sections <br />310 and 312 <br />20 <br />6-6" By 6-8" Rubber Speed Cushion <br />28 EA <br />$1,800.00 <br />$50,400.00 <br />$1,700.00 <br />$47,600.00 <br />per City Std Plans 131 A/ B <br />21 <br />9'-2" By 6-8" Rubber Speed Cushion <br />33 EA <br />$2,700.00 <br />$89,100.00 <br />$2,100.00 <br />$69,300.00 <br />per City Std Plans 131 A/ B <br />22 <br />10'-6" By 6'-8" Rubber Speed Cushion <br />2 EA <br />$3,000.00 <br />$6,000.00 <br />$2,400.00 <br />$4,800.00 <br />per City Std Plans 131 A/ B <br />23 <br />"Bump" Legend per City Std Plans 131 <br />42 EA <br />$150.00 <br />$6,300.00 <br />$150.00 <br />$6,300.00 <br />A/ B <br />24 <br />Rubber Speed Cushion Border Striping <br />21 EA <br />$250.00 <br />$5,250.00 <br />$150.00 <br />$3,150.00 <br />per City Std Plans 131 A/ B <br />25 <br />W13-1 Sign (15 MPH) per City <br />10 EA <br />$150.00 <br />$1,500.00 <br />$100.00 <br />$1,000.00 <br />Standard Plans 131 A/ B <br />26 <br />W17-1 Sign (Speed Bump) per City <br />10 EA <br />$150.00 <br />$1,500.00 <br />$100.00 <br />$1,000.00 <br />Std Plans 131 A/ B <br />27 <br />Furnish and Install New Sign Post Per <br />12 EA <br />$150.00 <br />$1,800.00 <br />$150.00 <br />$1,800.00 <br />City Std Plan 136 <br />TOTAL BASE BID: $880,823.20 <br />$999,665.00 <br />ADDITIVE ALTERNATE A <br />Al <br />Adjust EBMUD Water Valve Pot to <br />13 EA <br />$1,000.00 <br />$13,000.00 <br />$1,000.00 <br />$13,000.00 <br />Grade per Section 301-1.6 <br />Bid Summary - Annual Overlay Rehab 2014-15 Page 2 of 3 Printed 5/21/2015 @ 3:36 PM <br />