Laserfiche WebLink
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significance <br />Significance <br />Before <br />With <br />Significant Impact <br />Mitigation <br />Mitigation Measures <br />Mitigation <br />HAZ-3. Implementation of the Project would not emit <br />No Impact <br />N/A <br />N/A <br />hazardous emissions or handle hazardous or acutely <br />hazardous materials, substances, or waste within %-mile <br />of an existing or proposed school. <br />HAZ-4. The Project would not be located on a site which is <br />No Impact <br />N/A <br />N/A <br />included on a list of hazardous materials sites compiled <br />pursuant to Government Code Section 65962.5 and, as a <br />result, create a significant hazard to the public or the <br />environment. <br />HAZ-5. Implementation of the Project within 2 miles of a <br />LTS <br />N/A <br />N/A <br />public airport would not result in a safety hazard for <br />people residing or working in the Project area. <br />HAZ-6. The project would not be within the vicinity of a <br />No Impact <br />N/A <br />N/A <br />private airstrip and result in a safety hazard for people <br />residing or working in the project area. <br />HAZ-7. Implementation of the Project would not impair <br />LTS <br />N/A <br />N/A <br />implementation of, or physically interfere with, an <br />adopted emergency response plan or emergency <br />evacuation plan. <br />HAZ-8. Implementation of the project would not expose <br />No Impact <br />N/A <br />N/A <br />people or structures to a significant risk of loss, injury, or <br />death involving wildland fires, including where wildlands <br />are adjacent to urbanized areas or where residences are <br />intermixed with wildlands. <br />HAZ-9. Implementation of the Project, in combination <br />LTS <br />N/A <br />N/A <br />with past, present, and reasonably foreseeable projects, <br />would result in less -than -significant cumulative impacts <br />with respect to hazards and hazardous materials. <br />HYDROLOGY AND WATER QUALITY <br />HYDRO -1A. Construction activities could temporarily <br />S <br />HYDRO -1A. Minimize Impacts to Water Quality during Waterside <br />LTS <br />degrade water quality with increases in suspended <br />Demolition and Construction Activities. The following mitigation <br />sediment and turbidity and could result in the release of <br />measures are designed to avoid adverse impacts on water quality <br />chemicals and hydrocarbon fuels into the water column. <br />during waterside demolition and construction activities: <br />