My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0720
>
4A Public Hearing 2015 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:57:43 AM
Creation date
7/30/2015 4:33:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0720 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Reso 2015-125
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
814
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significant Impact <br />Significance <br />Before <br />Mitigation <br />Mitigation Measures <br />■ Piles shall be removed during low tide periods to minimize the <br />amount of sediments re -suspended in the water column. <br />■ When removing piles, the pile shall be hit or vibrated first to <br />break the bond with the sediment, which would minimize the <br />likelihood of the pile breaking and reduce the amount of <br />sediment released into the water column. <br />■ A turbidity curtain shall be installed prior to removing or installing <br />piles or any other waterside activities to minimize turbidity <br />impacts in the water column. <br />■ Piles shall be pulled from the subsurface and quickly placed onto <br />a receiving barge or land to minimize potential releases of <br />creosote, petroleum sheens, and turbidity in the water column. <br />Piles shall not be rinsed or washed. The storage area for the piles <br />shall include straw bales, filter fabric, or other containment <br />devices to contain runoff. <br />■ During removal of the existing dock system, floating rafts and/or <br />trash and debris containment booms shall be placed under the <br />docks and around the areas of demolition to contain debris that <br />may be released during these activities. <br />■ Any waterside construction activities shall be restricted to the <br />period from June 15 through October when special -status fish <br />species would most likely not be expected within the affected <br />areas. <br />Significance <br />With <br />Mitigation <br />HYDRO -113. Construction activities could temporarily S <br />HYDRO -113. Minimize Potential for Fuel Releases During Waterside LTS <br />degrade water quality with increases in suspended <br />Demolition and Other Construction Activities. The following <br />sediment and turbidity and could result in the release of <br />mitigation measures are designed to avoid potential releases of fuel <br />chemicals and hydrocarbon fuels into the water column. <br />constituents into the water column during demolition/construction <br />activities: <br />■ A spill contingency plan shall be prepared that addresses the <br />potential for an accidental release of fuel into navigable <br />waterways. The plan shall include floating booms and absorbent <br />materials to recover hazardous spills and include provisions for <br />containment, removal, and disposal of spilled materials. <br />■ No fueling, cleaning, or maintenance of vehicles or equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.