Laserfiche WebLink
TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significant Impact <br />Significance <br />Before <br />Mitigation Mitigation Measures <br />Significance <br />With <br />Mitigation <br />TRAF-4B: The proposed southern driveway of the North <br />Golf Course Residential component would potentially <br />result in a design hazard due to its location in relation to <br />the proposed Monarch Bay Drive and Mulford Point Drive <br />intersection. <br />S TRAF-4B: Move the Southern Driveway of the North Golf Course <br />residential component to the north, to form a standard four-legged <br />intersection. This measure shall be implemented in coordination <br />with Mitigation Measure TRAF-1D. <br />LTS <br />TRAF-5. The proposed Project would not result in <br />inadequate emergency access. <br />LTS N/A N/A <br />TRAF-6. The proposed Project would not conflict with <br />adopted policies, plans, or programs regarding public <br />transit, bicycle, or pedestrian facilities, or otherwise <br />decrease the performance or safety of such facilities. <br />LTS N/A N/A <br />TRAF-7A. The addition of traffic associated with <br />implementation of the proposed Project would cause the <br />intersection level of service at Doolittle Drive and Marina <br />Boulevard (#11) to reduce from LOS D to LOS F in the AM <br />and PM peak hours under Near-Term Cumulative <br />Conditions. <br />S TRAF-7A: Implementation of Mitigation Measures TRAF-1A.1 – TRAF- <br />1A.2 for the eastbound approach identified under the baseline Plus <br />Project condition. <br />LTS <br />TRAF-7B: The addition of traffic associated with <br />implementation of the proposed Project would cause I- <br />880 southbound ramps and Marina Boulevard (#14) to <br />reduce to LOS E during both AM and Saturday peak hours, <br />and would further reduce the service levels from LOS E to <br />LOS F in the PM peak hour, under Near-Term Cumulative <br />Conditions. <br />S TRAF-7B.1: Modify the traffic signal to a two-phase operation to <br />provide non-conflicting: <br /> Eastbound and westbound through movements on Marina <br />Boulevard during the first phase. <br /> Southbound right-turn, northbound right-turn and westbound <br />left-turn movements during the second phase. <br />SU <br /> TRAF-7B.2: Prohibit westbound U-turn movements. <br />TRAF-7C: The proposed Project would cause operations at <br />the intersection of San Leandro Boulevard and Marina <br />Boulevard (#18) to reduce from LOS D to LOS E in the AM <br />S TRAF-7C.1: Add a northbound left-turn lane on San Leandro <br />Boulevard to provide two left-turn lanes: one through lane and one <br />shared through-right turn lane. <br />