My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2015-125
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2015
>
Reso 2015-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 5:44:18 PM
Creation date
7/30/2015 4:41:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
4A Public Hearing 2015 0720
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
799
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5,000-square-foot full-service restaurant. <br /> 8,000-square-foot full-service restaurant. <br /> Between 50,000 and 100,000 square feet of office along Monarch Bay Drive and an 800-space parking <br />structure, which would be shared with residential units. The office will be approximately 40 feet in <br />height and the parking structure will depend on parking counts, but no more than 32 feet in height. <br /> Up to 159 multi-family rental units. A mixed-use building (30,000-square-foot) containing a café/boat <br />rental facility (8,000 square feet) and up to 61 condominium units on the former Boatworks site. <br /> An approximately 2,500-square-foot Library/Community Building. <br /> Associated infrastructure. <br /> Removal of wood and concrete docks and associated piers, including Blue Dolphin Restaurant <br />platform <br /> Removal of the existing El Torito Restaurant building <br /> Removal of the San Leandro Yacht Club building <br /> Removal of public/private restrooms ‘A’, ‘E/F’, and ‘N/O’ <br /> Removal of harbormaster’s office , fuel pump/dock, and underground storage tank. <br />3.4.2.3 PHASE 2 <br /> 64 2- to 3-story townhomes built on Monarch Bay Drive. <br /> 70 homes on Fairway Drive built within the redesigned Marina Golf Course: <br />- Up to 42 2-story single-family detached homes. <br />- Up to 28 townhomes. <br /> Associated infrastructure. <br /> Removal of golf course concession stands <br />3.4.2.4 PHASE 3 <br /> The balance of the 150,000 square feet of office (unless the market allows it to be absorbed during <br />Phase 2). The parking structure will already have been built during Phase I. <br /> Associated infrastructure. <br />3.5 REQUIRED PERMITS AND APPROVALS <br />The City of San Leandro is the Lead Agency for the preparation and certification of the EIR. Responsible, <br />trustee and other agencies will be consulted during the EIR process, Subsequent development <br />entitlements for the Project will require approval of State, federal, and regional responsible and trustee <br />agencies that may rely on the EIR for decisions in their areas of expertise. <br />The Project will also require a series of planning entitlements, including a General Plan amendment to <br />change the land use designation from General Commercial and Parks/Recreation to General Commercial;
The URL can be used to link to this page
Your browser does not support the video tag.