My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Trust of Sung H Paskewitz
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Trust of Sung H Paskewitz
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 4:55:05 PM
Creation date
8/3/2015 4:55:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/15/2015
Retention
PERM
Document Relationships
Reso 2015-066
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> PROJECT <br /> Scope of Work (SOW) <br /> Install six Ruckus Wireless outdoor access points (APs) along with controller. <br /> Splice, Test and Connect fiber from Pelton Sign to the Library on Estudillo, using City of <br /> San Leandro fiber that is part of Lit San Leandro Loop. <br /> Detailed SOW <br /> 1. Install (4) Wireless Access Point on existing light standards & tap into light <br /> standard power to run AP's <br /> 2. Install (2) AP's on Pelton sign <br /> 3. Outdoor NEMA enclosure. Install customer provided 24X24X8 NEMA Enclosure <br /> by newspaper stands <br /> 4. Run AC power to NEMA enclosure, 15 amp, run two CAT6 cables from NEMA <br /> enclosure to AP's on sign <br /> 5. Install splice panel in NEMA Enclosure <br /> 6. Intercept conduit and fiber backbone on E.14th St. at splice enclosure <br /> 7. Install #5 pull box in front of Pelton sign on sidewalk. Install conduit from #5 pull <br /> box to decorative street light box <br /> 8. Install 12 strand lateral cable from AP to splice enclosure, ring cut 288 strand <br /> fiber and splice two strands of fiber into 12 strand lateral cable & test fiber <br /> 9. Lit San Leandro to provide all equipment &fiber optic cable <br /> 10.St. Francis Electric to supply concrete, conduit, wire, pullboxes <br /> Public Wi-Fi Installation 13 <br /> Loan Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.