Laserfiche WebLink
Exhibit A <br /> PROJECT <br /> Scope of Work (SOW) <br /> Install six Ruckus Wireless outdoor access points (APs) along with controller. <br /> Splice, Test and Connect fiber from Pelton Sign to the Library on Estudillo, using City of <br /> San Leandro fiber that is part of Lit San Leandro Loop. <br /> Detailed SOW <br /> 1. Install (4) Wireless Access Point on existing light standards & tap into light <br /> standard power to run AP's <br /> 2. Install (2) AP's on Pelton sign <br /> 3. Outdoor NEMA enclosure. Install customer provided 24X24X8 NEMA Enclosure <br /> by newspaper stands <br /> 4. Run AC power to NEMA enclosure, 15 amp, run two CAT6 cables from NEMA <br /> enclosure to AP's on sign <br /> 5. Install splice panel in NEMA Enclosure <br /> 6. Intercept conduit and fiber backbone on E.14th St. at splice enclosure <br /> 7. Install #5 pull box in front of Pelton sign on sidewalk. Install conduit from #5 pull <br /> box to decorative street light box <br /> 8. Install 12 strand lateral cable from AP to splice enclosure, ring cut 288 strand <br /> fiber and splice two strands of fiber into 12 strand lateral cable & test fiber <br /> 9. Lit San Leandro to provide all equipment &fiber optic cable <br /> 10.St. Francis Electric to supply concrete, conduit, wire, pullboxes <br /> Public Wi-Fi Installation 13 <br /> Loan Agreement <br />