My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2015213768
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2015213768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 3:48:42 PM
Creation date
8/17/2015 3:48:40 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/24/2014
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIO Stantec <br /> INSPECTION /MAINTENANCE RESPONSIBILITY FOR BMPS <br /> In the following tables the BMP inspection and maintenance responsible party is <br /> identified. These tables also describe the maintenance activity and the frequency for <br /> the inspection. Records of maintenance and inspections shall be kept by the Property <br /> Owner/Site Manager and should be made available to government agencies. <br /> Responsible party details are: <br /> Property Owner <br /> Name: Barry Skolnick <br /> Title: Area Vice President <br /> Company: Waste Management of Alameda County, Inc. <br /> Address: 172 98th Avenue, Oakland, CA 94603 <br /> Phone: (510) 613-2112 <br /> O & M Manager <br /> Name: Jack Isola <br /> Title: Senior District Manager <br /> Company: Waste Management of Alameda County, Inc. <br /> Address: 172 98th Avenue, Oakland, CA 94603 <br /> Phone: (510) 613-2112 <br /> During construction, until such time as a transfer of ownership is completed Waste <br /> Management of Alameda County will serve as the responsible parties for installation, <br /> inspection, implementation, and maintenance of the structural and non-structural BMPs <br /> outlined in this Operation and Maintenance Plan. Maintenance will be conducted in <br /> accordance with Table 1 - BMP Maintenance Responsibility. All structural BMPs are to <br /> be inspected, cleaned and repaired, as needed, before the beginning of each storm <br /> season (between August 1st and October 1st), after every major storm (precipitation <br /> greater than 0.75 inches) and at least once per month. All debris and water pollutants <br /> removed from structural BMPs during clean out shall be contained and disposed of <br /> properly. <br /> For a review of the BMPs deemed as routine for each usage, see Section 2.3 of the site's <br /> Storm Water Pollution Prevention Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.