My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2015213768
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2015213768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 3:48:42 PM
Creation date
8/17/2015 3:48:40 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/24/2014
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Table 1: BMP Inspection and Maintenance Responsibility <br /> BMP Designation Responsible Party Description of inspection and Maintenance Activity Frequency of Maintenance <br /> Vegetated Swale Waste Inspect swales at least twice annually for erosion, Monthly <br /> Management of damage to vegetation, and sediment and debris <br /> Alameda County or accumulation preferably at the end of the wet <br /> Contracted Third season to schedule summer maintenance and <br /> Party before major fall runoff to be sure the swale is ready <br /> for winter. However additional inspection after <br /> periods of heavy runoff is desirable. The Swale should <br /> be checked for debris and litter, and areas of <br /> sediment accumulation. <br /> Vegetated Swale Waste Remove obstructions and trash, trash should be Monthly <br /> Management of removed prior to mowing. <br /> Alameda County or <br /> Contracted Third <br /> Party <br /> Vegetated Swale Waste Sediment accumulating near culverts and in Monthly <br /> Management of channels should be removed when it builds up to 75 <br /> Alameda County or mm (3in.) at any spot, or covers vegetation. <br /> Contracted Third <br /> Party <br /> Vegetated Swale Waste Regular inspection for pools of water ponded flow After rain events or minimum <br /> Management of within 5 days after a rainfall event, and restoration of of monthly <br /> Alameda County or positive drainage if ponding occurs. <br /> Contracted Third <br /> Party <br />
The URL can be used to link to this page
Your browser does not support the video tag.