BID SUMMARY
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270
<br />BID NO.: 14-15.026
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Bay Construction
<br />DATE: Monday, August 3, 2015
<br />Date Approved: 6/17/2015
<br />4026 Martin Luther King Jr. Way
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />Oakland, CA 94609
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 658-7225
<br />Fax: (510) 658-4890
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />51
<br />Bottom rail on existing 12' chain link
<br />196 LF
<br />$10.50
<br />$2,058.00
<br />$12.00
<br />$2,352.00
<br />fence
<br />52
<br />Trash receptacles
<br />6 EA
<br />$1,470.00
<br />$8,820.00
<br />$1,440.00
<br />$8,640.00
<br />53
<br />Picnic table
<br />4 EA
<br />$3,045.00
<br />$12,180.00
<br />$4,200.00
<br />$16,800.00
<br />54
<br />BBQ post and grill installation
<br />2 EA
<br />$1,050.00
<br />$2,100.00
<br />$600.00
<br />$1,200.00
<br />55
<br />Hot ash receptacle
<br />2 EA
<br />$840.00
<br />$1,680.00
<br />$1,320.00
<br />$2,640.00
<br />56
<br />Bench, steel, with back, 6' length
<br />11 EA
<br />$2,100.00
<br />$23,100.00
<br />$1,884.00
<br />$20,724.00
<br />57
<br />Bench, steel, with back, 8' length
<br />6 EA
<br />$2,100.00
<br />$12,600.00
<br />$2,016.00
<br />$12,096.00
<br />58
<br />Bench, steel, without back, 6' length
<br />2 EA
<br />$1,890.00
<br />$3,780.00
<br />$1,716.00
<br />$3,432.00
<br />59
<br />Game table
<br />3 EA
<br />$2,100.00
<br />$6,300.00
<br />$3,204.00
<br />$9,612.00
<br />60
<br />Bollard, folding
<br />2 EA
<br />$1,575.00
<br />$3,150.00
<br />$1,284.00
<br />$2,568.00
<br />61
<br />Bollard, retractable
<br />1 EA
<br />$1,600.00
<br />$1,600.00
<br />$1,284.00
<br />$1,284.00
<br />62
<br />Bicycle rack
<br />9 EA
<br />$903.00
<br />$8,127.00
<br />$1,320.00
<br />$11,880.00
<br />63
<br />Basketball hoop, backboard, and post
<br />2 EA
<br />$3,150.00
<br />$6,300.00
<br />$2,640.00
<br />$5,280.00
<br />64
<br />Relocate existing boulders
<br />9 EA
<br />$315.00
<br />$2,835.00
<br />$300.00
<br />$2,700.00
<br />65
<br />Boulders
<br />1 EA
<br />$903.00
<br />$903.00
<br />$1,200.00
<br />$1,200:00
<br />66
<br />Install dedication plaque to be furnished
<br />1 LS
<br />$525.00
<br />$525.00
<br />$600.00
<br />$600.00
<br />by City
<br />67
<br />Soil preparation and fine grading
<br />1 LS
<br />$36,750.00
<br />$36,750.00
<br />$44,400.00
<br />$44,400.00
<br />68
<br />Tree - 36 inch box size
<br />4 EA
<br />$735.00
<br />$2,940.00
<br />$1,680.00
<br />$6,720.00
<br />69
<br />Tree - 24 inch box size
<br />1 EA
<br />$367.50
<br />$367.50
<br />$552.00
<br />$552.00
<br />70
<br />Tree - 15 gal size
<br />73 EA
<br />$157.50
<br />$11,497.50
<br />$432.00
<br />$31,536.00
<br />71
<br />Turf from sod
<br />19397 SF
<br />$0.79
<br />$15,275.14
<br />$3.00
<br />$58,191.00
<br />72
<br />Shrubs - 5 gallon
<br />97 EA
<br />$31.50
<br />$3,055.50
<br />$48.00
<br />$4,656.00
<br />73
<br />Shrubs - 1 gallon
<br />1568 EA
<br />$15.75
<br />$24,696.00
<br />$16.80
<br />$26,342.40
<br />74
<br />Mulch, 3" layer
<br />243 CY
<br />$57.75
<br />$14,033.25
<br />$114.00
<br />$27,702.00
<br />75
<br />Root barrier
<br />1252 LF
<br />$10.50
<br />$13,146.00
<br />$12.00
<br />$15,024.00
<br />76
<br />Irrigation system
<br />1 LS
<br />$241,500.00
<br />$241,500.00
<br />$120,000.00
<br />$120,000.00
<br />77
<br />Plant establishment period
<br />1 LS
<br />$12,600.00
<br />$12,600.00
<br />$39,000.00
<br />$39,000.00
<br />78
<br />1 Recycling receptacles
<br />1 6 EA
<br />1 $1,470.001
<br />$8,820.00
<br />$1,488.00
<br />$8,928.00
<br />TOTAL BASE BID: $2,523,474.84
<br />$2,657,788.20
<br />ADDITIVE BID ITEM A
<br />Al lWell Construction Mobilization 1 LS $5,000.001 $5,000.001
<br />$18,600.001 $18,600.00
<br />Siempre Verde Park Rehab - Bid Summary Page 9 of 12 Printed 8/4/2015 @ 4:49 PM