Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />BID NO.: 14-15.026 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Bay Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: 6/17/2015 <br />4026 Martin Luther King Jr. Way <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Oakland, CA 94609 <br />LOCATION: City Clerk's Office <br />Phone: (510) 658-7225 <br />Fax: (510) 658-4890 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />51 <br />Bottom rail on existing 12' chain link <br />196 LF <br />$10.50 <br />$2,058.00 <br />$12.00 <br />$2,352.00 <br />fence <br />52 <br />Trash receptacles <br />6 EA <br />$1,470.00 <br />$8,820.00 <br />$1,440.00 <br />$8,640.00 <br />53 <br />Picnic table <br />4 EA <br />$3,045.00 <br />$12,180.00 <br />$4,200.00 <br />$16,800.00 <br />54 <br />BBQ post and grill installation <br />2 EA <br />$1,050.00 <br />$2,100.00 <br />$600.00 <br />$1,200.00 <br />55 <br />Hot ash receptacle <br />2 EA <br />$840.00 <br />$1,680.00 <br />$1,320.00 <br />$2,640.00 <br />56 <br />Bench, steel, with back, 6' length <br />11 EA <br />$2,100.00 <br />$23,100.00 <br />$1,884.00 <br />$20,724.00 <br />57 <br />Bench, steel, with back, 8' length <br />6 EA <br />$2,100.00 <br />$12,600.00 <br />$2,016.00 <br />$12,096.00 <br />58 <br />Bench, steel, without back, 6' length <br />2 EA <br />$1,890.00 <br />$3,780.00 <br />$1,716.00 <br />$3,432.00 <br />59 <br />Game table <br />3 EA <br />$2,100.00 <br />$6,300.00 <br />$3,204.00 <br />$9,612.00 <br />60 <br />Bollard, folding <br />2 EA <br />$1,575.00 <br />$3,150.00 <br />$1,284.00 <br />$2,568.00 <br />61 <br />Bollard, retractable <br />1 EA <br />$1,600.00 <br />$1,600.00 <br />$1,284.00 <br />$1,284.00 <br />62 <br />Bicycle rack <br />9 EA <br />$903.00 <br />$8,127.00 <br />$1,320.00 <br />$11,880.00 <br />63 <br />Basketball hoop, backboard, and post <br />2 EA <br />$3,150.00 <br />$6,300.00 <br />$2,640.00 <br />$5,280.00 <br />64 <br />Relocate existing boulders <br />9 EA <br />$315.00 <br />$2,835.00 <br />$300.00 <br />$2,700.00 <br />65 <br />Boulders <br />1 EA <br />$903.00 <br />$903.00 <br />$1,200.00 <br />$1,200:00 <br />66 <br />Install dedication plaque to be furnished <br />1 LS <br />$525.00 <br />$525.00 <br />$600.00 <br />$600.00 <br />by City <br />67 <br />Soil preparation and fine grading <br />1 LS <br />$36,750.00 <br />$36,750.00 <br />$44,400.00 <br />$44,400.00 <br />68 <br />Tree - 36 inch box size <br />4 EA <br />$735.00 <br />$2,940.00 <br />$1,680.00 <br />$6,720.00 <br />69 <br />Tree - 24 inch box size <br />1 EA <br />$367.50 <br />$367.50 <br />$552.00 <br />$552.00 <br />70 <br />Tree - 15 gal size <br />73 EA <br />$157.50 <br />$11,497.50 <br />$432.00 <br />$31,536.00 <br />71 <br />Turf from sod <br />19397 SF <br />$0.79 <br />$15,275.14 <br />$3.00 <br />$58,191.00 <br />72 <br />Shrubs - 5 gallon <br />97 EA <br />$31.50 <br />$3,055.50 <br />$48.00 <br />$4,656.00 <br />73 <br />Shrubs - 1 gallon <br />1568 EA <br />$15.75 <br />$24,696.00 <br />$16.80 <br />$26,342.40 <br />74 <br />Mulch, 3" layer <br />243 CY <br />$57.75 <br />$14,033.25 <br />$114.00 <br />$27,702.00 <br />75 <br />Root barrier <br />1252 LF <br />$10.50 <br />$13,146.00 <br />$12.00 <br />$15,024.00 <br />76 <br />Irrigation system <br />1 LS <br />$241,500.00 <br />$241,500.00 <br />$120,000.00 <br />$120,000.00 <br />77 <br />Plant establishment period <br />1 LS <br />$12,600.00 <br />$12,600.00 <br />$39,000.00 <br />$39,000.00 <br />78 <br />1 Recycling receptacles <br />1 6 EA <br />1 $1,470.001 <br />$8,820.00 <br />$1,488.00 <br />$8,928.00 <br />TOTAL BASE BID: $2,523,474.84 <br />$2,657,788.20 <br />ADDITIVE BID ITEM A <br />Al lWell Construction Mobilization 1 LS $5,000.001 $5,000.001 <br />$18,600.001 $18,600.00 <br />Siempre Verde Park Rehab - Bid Summary Page 9 of 12 Printed 8/4/2015 @ 4:49 PM <br />