Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2016.0270 <br />BID NO.: 14-16.026 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Bay Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: 6/17/2015 <br />4026 Martin Luther King Jr. Way <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Oakland, CA 94609 <br />LOCATION: City Clerk's Office <br />Phone: (510) 658-7225 <br />Fax: (510) 658-4890 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />A2 <br />30 -inch Diameter Conductor Casing <br />25 LF <br />$250.00 <br />$6,250.00 <br />$120.00 <br />$3,000.00 <br />A3 <br />8 -1/4 -inch Diameter Pilot Bore <br />450 LF <br />$60.00 <br />$27,000.00 <br />$132.00 <br />$59,400.00 <br />A4 <br />Electric Resistance and Gamma Ray <br />1 LS <br />$3,500.00 <br />$3,500.00 <br />$7,200.00 <br />$7,200.00 <br />Logging (E -log) <br />A5 <br />17 -1/4 -inch Diameter Final Bore <br />350 LF <br />$65.00 <br />$22,750.00 <br />$150.00 <br />$52,500.00 <br />A6 <br />Install 8 -inch Diameter SDR17 PVC <br />120 LF <br />$40.00 <br />$4,800.00 <br />$60.00 <br />$7,200.00 <br />Casing <br />A7 <br />Install 8 -inch Diameter SDR17 PVC <br />230 LF <br />$50.00 <br />$11,500.00 <br />$66.00 <br />$15,180.00 <br />Screens <br />A8 <br />Install 1/4" x No. 10 Filter Pack <br />250 LF <br />$10.00 <br />$2,500.00 <br />$67.20 <br />$16,800.00 <br />A9 <br />Install 10 -sack Sanitary Seal <br />100 LF <br />$75.00 <br />$7,500.00 <br />$93.60 <br />$9,360.00 <br />A10 <br />Well Development <br />24 HOUR <br />$500.00 <br />$12,000.00 <br />$450.00 <br />$10,800.00 <br />A11 <br />Pump Testing <br />1 LS <br />$17,500.00 <br />$17,500.00 <br />$1,980.00 <br />$1,980.00 <br />Al2 <br />Construct Wellhead Pedestal <br />1 LS <br />$5,000.00 <br />$5,000.00 <br />$10,800.00 <br />$10,800.00 <br />A13 <br />Install 3 -inch Diameter PVC Drop Pipe, <br />320 LF <br />$50.00 <br />$16,000.00 <br />$16.80 <br />$5,376.00 <br />Downhole Power Conductors, Tag Line <br />and Sounding Tube <br />A14 <br />Install Submersible Pump <br />1 LS <br />$5,000.00 <br />$5,000.00 <br />$8,400.00 <br />$8,400.00 <br />A15 <br />Install Wellhead Piping and Hydro- <br />1 LS <br />$15,000.00 <br />$15,000.00 <br />$12,000.00 <br />$12,000.00 <br />pneumatic System <br />A16 <br />Install Electrical Service and Controls <br />1 LS <br />$50,000.00 <br />$50,000.00 <br />$166,440.00 <br />$166,440.00 <br />TOTAL ADDITIVE BID ITEM A: $211,300.00 <br />$405,036.00 <br />ADDITIVE BID ITEM B <br />B1 <br />Mobilization and General Conditions <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$12,000.00 <br />$12,000.00 <br />B2 <br />Stormwater pollution prevention <br />1 <br />$1,000.00 <br />$1,000.00 <br />$3,000.00 <br />$3,000.00 <br />LS <br />B3 <br />Demolition - Offsite <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$12,000.00 <br />$12,000.00 <br />B4 <br />Detectable Truncated Domes <br />18 SF <br />$35.00 <br />$630.00 <br />$48.00 <br />$864.00 <br />B5 <br />Deduct Base bid curb ramp and base <br />1 EA <br />($4,200.00) <br />($4,200.00) <br />$2,640.00 <br />$2,640.00 <br />(Same as Bid Item 30) <br />B6 <br />Concrete paving - Pedestrian <br />83 SF <br />$12.00 <br />$996.001 <br />$24.00 <br />$1,992.00 <br />Siempre Verde Park Rehab - Bid Summary Page 10 of 12 Printed 8/4/2015 @ 4:49 PM <br />