BID SUMMARY
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2016.0270
<br />BID NO.: 14-16.026
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Bay Construction
<br />DATE: Monday, August 3, 2015
<br />Date Approved: 6/17/2015
<br />4026 Martin Luther King Jr. Way
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />Oakland, CA 94609
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 658-7225
<br />Fax: (510) 658-4890
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />A2
<br />30 -inch Diameter Conductor Casing
<br />25 LF
<br />$250.00
<br />$6,250.00
<br />$120.00
<br />$3,000.00
<br />A3
<br />8 -1/4 -inch Diameter Pilot Bore
<br />450 LF
<br />$60.00
<br />$27,000.00
<br />$132.00
<br />$59,400.00
<br />A4
<br />Electric Resistance and Gamma Ray
<br />1 LS
<br />$3,500.00
<br />$3,500.00
<br />$7,200.00
<br />$7,200.00
<br />Logging (E -log)
<br />A5
<br />17 -1/4 -inch Diameter Final Bore
<br />350 LF
<br />$65.00
<br />$22,750.00
<br />$150.00
<br />$52,500.00
<br />A6
<br />Install 8 -inch Diameter SDR17 PVC
<br />120 LF
<br />$40.00
<br />$4,800.00
<br />$60.00
<br />$7,200.00
<br />Casing
<br />A7
<br />Install 8 -inch Diameter SDR17 PVC
<br />230 LF
<br />$50.00
<br />$11,500.00
<br />$66.00
<br />$15,180.00
<br />Screens
<br />A8
<br />Install 1/4" x No. 10 Filter Pack
<br />250 LF
<br />$10.00
<br />$2,500.00
<br />$67.20
<br />$16,800.00
<br />A9
<br />Install 10 -sack Sanitary Seal
<br />100 LF
<br />$75.00
<br />$7,500.00
<br />$93.60
<br />$9,360.00
<br />A10
<br />Well Development
<br />24 HOUR
<br />$500.00
<br />$12,000.00
<br />$450.00
<br />$10,800.00
<br />A11
<br />Pump Testing
<br />1 LS
<br />$17,500.00
<br />$17,500.00
<br />$1,980.00
<br />$1,980.00
<br />Al2
<br />Construct Wellhead Pedestal
<br />1 LS
<br />$5,000.00
<br />$5,000.00
<br />$10,800.00
<br />$10,800.00
<br />A13
<br />Install 3 -inch Diameter PVC Drop Pipe,
<br />320 LF
<br />$50.00
<br />$16,000.00
<br />$16.80
<br />$5,376.00
<br />Downhole Power Conductors, Tag Line
<br />and Sounding Tube
<br />A14
<br />Install Submersible Pump
<br />1 LS
<br />$5,000.00
<br />$5,000.00
<br />$8,400.00
<br />$8,400.00
<br />A15
<br />Install Wellhead Piping and Hydro-
<br />1 LS
<br />$15,000.00
<br />$15,000.00
<br />$12,000.00
<br />$12,000.00
<br />pneumatic System
<br />A16
<br />Install Electrical Service and Controls
<br />1 LS
<br />$50,000.00
<br />$50,000.00
<br />$166,440.00
<br />$166,440.00
<br />TOTAL ADDITIVE BID ITEM A: $211,300.00
<br />$405,036.00
<br />ADDITIVE BID ITEM B
<br />B1
<br />Mobilization and General Conditions
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$12,000.00
<br />$12,000.00
<br />B2
<br />Stormwater pollution prevention
<br />1
<br />$1,000.00
<br />$1,000.00
<br />$3,000.00
<br />$3,000.00
<br />LS
<br />B3
<br />Demolition - Offsite
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$12,000.00
<br />$12,000.00
<br />B4
<br />Detectable Truncated Domes
<br />18 SF
<br />$35.00
<br />$630.00
<br />$48.00
<br />$864.00
<br />B5
<br />Deduct Base bid curb ramp and base
<br />1 EA
<br />($4,200.00)
<br />($4,200.00)
<br />$2,640.00
<br />$2,640.00
<br />(Same as Bid Item 30)
<br />B6
<br />Concrete paving - Pedestrian
<br />83 SF
<br />$12.00
<br />$996.001
<br />$24.00
<br />$1,992.00
<br />Siempre Verde Park Rehab - Bid Summary Page 10 of 12 Printed 8/4/2015 @ 4:49 PM