Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />BID NO.: 14-15.026 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Bay Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: <br />6/17/2015 <br />4026 Martin Luther King Jr. Way <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Oakland, CA 94609 <br />LOCATION: City Clerk's Office <br />Phone: (510) 658-7225 <br />Fax: (510) 658-4890 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />B7 <br />City std. sidewalk and base <br />300 SF <br />$10.00 <br />$3,000.00 <br />$24.00 <br />$7,200.00 <br />B8 <br />City std. curb & gutter & base, incl. <br />135 LF <br />$50.00 <br />$6,750.00 <br />$96.00 <br />$12,960.00 <br />courtesy curb, flush curb, & 9" full depth <br />AC <br />B9 <br />City std. vertical curb & base <br />22 LF <br />$35.00 <br />$770.00 <br />$60.00 <br />$1,320.00 <br />B10 <br />Soil preparation and fine grading <br />529 SF <br />$0.75 <br />$396.75 <br />$2.40 <br />$1,269.60 <br />B11 <br />Tree - 24 inch box size <br />2 EA <br />$350.00 <br />$700.00 <br />$552.00 <br />$1,104.00 <br />B12 <br />Shrubs - 1 gallon <br />30 EA <br />$12.00 <br />$360.00 <br />$16.80 <br />$504.00 <br />B13 <br />Mulch, 3" layer <br />5 CY <br />$55.00 <br />$275.00 <br />$132.00 <br />$660.00 <br />B14 <br />Root barrier <br />108 LF <br />$7.00$756.00 <br />$12.00 <br />$1,296.00 <br />B15 <br />I Irrigation system <br />529 SF <br />1 $4.00 <br />$2,116.00 <br />$7.201 <br />$3,808.80 <br />TOTAL ADDITIVE BID ITEM B: <br />$33,549.75 <br />$62,618.40 <br />ADDITIVE BID ITEM C <br />C1 <br />Arbor Shade Canopy 1 LS <br />$60,000.00 <br />$60,000.00 <br />$55,200.00 <br />$55,200.00 <br />TOTAL ADDITIVE BID ITEM C: <br />$60,000.00 <br />$55,200.00 <br />ADDITIVE BID ITEM D <br />D1 <br />Shade canopy at picnic tables <br />2 EA <br />$8,400.00 <br />$16,800.00 <br />$5,880.00 <br />$11,760.00 <br />D2 <br />Ping Pong Table <br />2 EA <br />$10,500.00 <br />$21,000.00 <br />$4,080.00 <br />$8,160.00 <br />TOTAL ADDITIVE BID D: <br />$37,800.00 <br />$19,920.00 <br />TOTAL BASE BID: <br />$2,523,474.84 <br />$2,657,788.20 <br />TOTAL BASE BID + ADDITIVE BID ITEM A: <br />$2,734,774.84 <br />$3,062,824.20 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A & B: <br />$2,768,324.59 <br />$3,125,442.60 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, & C: <br />$2,828,324.59 <br />$3,180,642.60 <br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, C & D: <br />$2,866,124.59 <br />$3,200,562.60 <br />Siempre Verde Park Rehab - Bid Summary Page 11 of 12 Printed 8/4/2015 @ 4:49 PM <br />