BID SUMMARY
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270
<br />BID NO.: 14-15.026
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Bay Construction
<br />DATE: Monday, August 3, 2015
<br />Date Approved:
<br />6/17/2015
<br />4026 Martin Luther King Jr. Way
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />Oakland, CA 94609
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 658-7225
<br />Fax: (510) 658-4890
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />B7
<br />City std. sidewalk and base
<br />300 SF
<br />$10.00
<br />$3,000.00
<br />$24.00
<br />$7,200.00
<br />B8
<br />City std. curb & gutter & base, incl.
<br />135 LF
<br />$50.00
<br />$6,750.00
<br />$96.00
<br />$12,960.00
<br />courtesy curb, flush curb, & 9" full depth
<br />AC
<br />B9
<br />City std. vertical curb & base
<br />22 LF
<br />$35.00
<br />$770.00
<br />$60.00
<br />$1,320.00
<br />B10
<br />Soil preparation and fine grading
<br />529 SF
<br />$0.75
<br />$396.75
<br />$2.40
<br />$1,269.60
<br />B11
<br />Tree - 24 inch box size
<br />2 EA
<br />$350.00
<br />$700.00
<br />$552.00
<br />$1,104.00
<br />B12
<br />Shrubs - 1 gallon
<br />30 EA
<br />$12.00
<br />$360.00
<br />$16.80
<br />$504.00
<br />B13
<br />Mulch, 3" layer
<br />5 CY
<br />$55.00
<br />$275.00
<br />$132.00
<br />$660.00
<br />B14
<br />Root barrier
<br />108 LF
<br />$7.00$756.00
<br />$12.00
<br />$1,296.00
<br />B15
<br />I Irrigation system
<br />529 SF
<br />1 $4.00
<br />$2,116.00
<br />$7.201
<br />$3,808.80
<br />TOTAL ADDITIVE BID ITEM B:
<br />$33,549.75
<br />$62,618.40
<br />ADDITIVE BID ITEM C
<br />C1
<br />Arbor Shade Canopy 1 LS
<br />$60,000.00
<br />$60,000.00
<br />$55,200.00
<br />$55,200.00
<br />TOTAL ADDITIVE BID ITEM C:
<br />$60,000.00
<br />$55,200.00
<br />ADDITIVE BID ITEM D
<br />D1
<br />Shade canopy at picnic tables
<br />2 EA
<br />$8,400.00
<br />$16,800.00
<br />$5,880.00
<br />$11,760.00
<br />D2
<br />Ping Pong Table
<br />2 EA
<br />$10,500.00
<br />$21,000.00
<br />$4,080.00
<br />$8,160.00
<br />TOTAL ADDITIVE BID D:
<br />$37,800.00
<br />$19,920.00
<br />TOTAL BASE BID:
<br />$2,523,474.84
<br />$2,657,788.20
<br />TOTAL BASE BID + ADDITIVE BID ITEM A:
<br />$2,734,774.84
<br />$3,062,824.20
<br />TOTAL BASE BID + ADDITIVE BID ITEMS A & B:
<br />$2,768,324.59
<br />$3,125,442.60
<br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, & C:
<br />$2,828,324.59
<br />$3,180,642.60
<br />TOTAL BASE BID + ADDITIVE BID ITEMS A, B, C & D:
<br />$2,866,124.59
<br />$3,200,562.60
<br />Siempre Verde Park Rehab - Bid Summary Page 11 of 12 Printed 8/4/2015 @ 4:49 PM