<br />document is a summary of bids received for the subject project and are
<br />vided only as a convenience. Listing of a particular bid is not a finding that such
<br />has been found to be responsive or accepted as complete by the City: An
<br />and of contract, if any; is subject to approval of the City Council and/or the City
<br />iage,r. Contractors should refer to the contract documents for bidding
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270 .
<br />BID NO.: 14-15.026
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />RobertA. Bothman, Inc.
<br />Guerra Construction
<br />RGW Construction
<br />DATE: Monday, August 3, 2015
<br />Date Approved:
<br />6/17/2015
<br />2690 Scott Boulevard
<br />984 Memorex Drive
<br />550 Greenville Road
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />Santa Clara, CA 95050
<br />Santa Clara, CA 95050
<br />Livermore, Ca 94550
<br />LOCATION: City Clerk's Office
<br />Phone: (408) 279-2277
<br />Phone: (408) 279-2027
<br />Phone: (925) 606-2400
<br />Fax: (408) 279-2286
<br />Fax: (408) 279-2044
<br />Fax: (925) 961-1925
<br />ITEM
<br />I
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />I ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />BASE BID
<br />1
<br />Mobilization and General Conditions 1 LS
<br />$220,500.00
<br />$220,500.00
<br />$166,462.00
<br />$166,462.00
<br />$51,000.00
<br />$51,000.00
<br />$260,000.00
<br />$260,000.00
<br />2
<br />Erosion and Sedimentation Control, 1 LS
<br />$5,250.00
<br />$5,250.00
<br />, $19,173.00
<br />$19,173.00
<br />$11,000.00
<br />$11,000.00
<br />$50,000.70
<br />$50,000.70
<br />including SWPPP preparation and QSP
<br />inspections
<br />3
<br />Site Preparation 1 LS
<br />$130,000.00
<br />$130,000.00
<br />$42,000.00
<br />$42,000.00
<br />$74,000.00
<br />$74,000.00
<br />$135,000.00
<br />$135,000.00
<br />4
<br />Demolition - Offsite 1 LS
<br />$8,925.00
<br />$8,925.00
<br />$2,900.00
<br />$2,900.00
<br />$2,500.00
<br />$2,500.00
<br />$17,000.00
<br />$17,000.00
<br />5
<br />Cuttfill (balanced) (F) 1163 CY
<br />$15.75
<br />$18,317.25
<br />$110.00'
<br />$127,930.00
<br />$28.00
<br />$32,564.00
<br />$40.00
<br />$46,520.00
<br />6
<br />Export excess cut 251 CY
<br />$26.25
<br />$6,588.75
<br />$5.00
<br />$1,255.00
<br />$90.00
<br />$22,590.00
<br />$45.00
<br />$11,295.00
<br />7
<br />Engineered fill below pavement 688 CY
<br />$47.25
<br />$32,508.00
<br />$15.00
<br />$10,320.00
<br />$93.00
<br />$63,984.00
<br />$11.00
<br />$7,568.00
<br />8
<br />6" PVC SDR -26 Sanitary sewer 75 LF
<br />$84.00
<br />$6,300.00
<br />$230.00
<br />$17,250.00
<br />$35.00
<br />$2,625.00
<br />$450.00
<br />$33,750.00
<br />9
<br />Sanitary sewer cleanout 1 EA
<br />$1,575.00
<br />$1,575.00
<br />$390.00
<br />$390.00
<br />$600.00
<br />$600.00
<br />$750.00
<br />$750.00
<br />10
<br />Extending domestic water service from 1 LS
<br />$3,675.00
<br />$3,675.00
<br />$3,000.00
<br />$3,000.00
<br />$1,500.00
<br />$1,500.00
<br />$3,200.00
<br />$3,200.00
<br />existing backflow to new building
<br />11
<br />New backflow prevention assembly & 1 LS
<br />$4,725.00
<br />$4,725.00
<br />$3,260.00
<br />$3,260.00
<br />$5,500.00
<br />$5,500.00
<br />$4,600.00
<br />$4,600.00
<br />enclosure with concrete pad
<br />12
<br />Replace water service between meter 1 LS
<br />$3,000.00
<br />$3,000.00
<br />$1,200.00
<br />$1,200.00
<br />$3,800.00
<br />$3,800.00
<br />$2,600.00
<br />$2,600.00
<br />and existing backflow preventer
<br />13
<br />Bioretention areas 1 LS
<br />$31,500.00
<br />$31,500.00
<br />$9,300.00
<br />$9,300.00
<br />$17,000.00
<br />$17,000.00
<br />$13,000.00
<br />$13,000.00
<br />14
<br />Mortar rock outfall 8 EA
<br />$525.00
<br />$4,200.00
<br />$990.00
<br />$7,920.00
<br />$300.00
<br />$2,400.00
<br />$500.00
<br />$4,000.00
<br />15
<br />Storm drain manholes 1 EA
<br />$4,725.00
<br />$4,725.00
<br />$5,280.00
<br />$5,280.00
<br />$8,300.00
<br />$8,300.00
<br />$3,550.00
<br />$3,550.00
<br />16
<br />Storm drain cleanout 1 EA
<br />$1,575.00
<br />$1,575.00
<br />$220.00
<br />$220.00
<br />$600.00
<br />$600.00
<br />$1,100.00
<br />$1,100.00
<br />17
<br />Bioretention drainage basin inlets with 2 EA
<br />$3,675.00
<br />$7,350.00
<br />$735.00
<br />$1,470.00
<br />$2,400.00
<br />$4,800.00
<br />$2,100.00
<br />$4,200.00
<br />domes
<br />Siempre Verde Park Rehab - Bid Summary
<br />Page 1 of 12
<br />Printed 8/4/2015 @ 4:49
<br />PM
<br />
|