Laserfiche WebLink
F. KIP <br />�9 n t~.TrArION <br />c <br />Rao RAtid f�Fib�dFAM[Afq <br />BID SUMMARY <br />document is a summary of bids received for the subject project and are <br />vided only as a convenience. Listing of a particular bid is not a finding that such <br />has been found to be responsive or accepted as complete by the City: An <br />and of contract, if any; is subject to approval of the City Council and/or the City <br />iage,r. Contractors should refer to the contract documents for bidding <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 . <br />BID NO.: 14-15.026 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />RobertA. Bothman, Inc. <br />Guerra Construction <br />RGW Construction <br />DATE: Monday, August 3, 2015 <br />Date Approved: <br />6/17/2015 <br />2690 Scott Boulevard <br />984 Memorex Drive <br />550 Greenville Road <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />Santa Clara, CA 95050 <br />Santa Clara, CA 95050 <br />Livermore, Ca 94550 <br />LOCATION: City Clerk's Office <br />Phone: (408) 279-2277 <br />Phone: (408) 279-2027 <br />Phone: (925) 606-2400 <br />Fax: (408) 279-2286 <br />Fax: (408) 279-2044 <br />Fax: (925) 961-1925 <br />ITEM <br />I <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />I ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID <br />1 <br />Mobilization and General Conditions 1 LS <br />$220,500.00 <br />$220,500.00 <br />$166,462.00 <br />$166,462.00 <br />$51,000.00 <br />$51,000.00 <br />$260,000.00 <br />$260,000.00 <br />2 <br />Erosion and Sedimentation Control, 1 LS <br />$5,250.00 <br />$5,250.00 <br />, $19,173.00 <br />$19,173.00 <br />$11,000.00 <br />$11,000.00 <br />$50,000.70 <br />$50,000.70 <br />including SWPPP preparation and QSP <br />inspections <br />3 <br />Site Preparation 1 LS <br />$130,000.00 <br />$130,000.00 <br />$42,000.00 <br />$42,000.00 <br />$74,000.00 <br />$74,000.00 <br />$135,000.00 <br />$135,000.00 <br />4 <br />Demolition - Offsite 1 LS <br />$8,925.00 <br />$8,925.00 <br />$2,900.00 <br />$2,900.00 <br />$2,500.00 <br />$2,500.00 <br />$17,000.00 <br />$17,000.00 <br />5 <br />Cuttfill (balanced) (F) 1163 CY <br />$15.75 <br />$18,317.25 <br />$110.00' <br />$127,930.00 <br />$28.00 <br />$32,564.00 <br />$40.00 <br />$46,520.00 <br />6 <br />Export excess cut 251 CY <br />$26.25 <br />$6,588.75 <br />$5.00 <br />$1,255.00 <br />$90.00 <br />$22,590.00 <br />$45.00 <br />$11,295.00 <br />7 <br />Engineered fill below pavement 688 CY <br />$47.25 <br />$32,508.00 <br />$15.00 <br />$10,320.00 <br />$93.00 <br />$63,984.00 <br />$11.00 <br />$7,568.00 <br />8 <br />6" PVC SDR -26 Sanitary sewer 75 LF <br />$84.00 <br />$6,300.00 <br />$230.00 <br />$17,250.00 <br />$35.00 <br />$2,625.00 <br />$450.00 <br />$33,750.00 <br />9 <br />Sanitary sewer cleanout 1 EA <br />$1,575.00 <br />$1,575.00 <br />$390.00 <br />$390.00 <br />$600.00 <br />$600.00 <br />$750.00 <br />$750.00 <br />10 <br />Extending domestic water service from 1 LS <br />$3,675.00 <br />$3,675.00 <br />$3,000.00 <br />$3,000.00 <br />$1,500.00 <br />$1,500.00 <br />$3,200.00 <br />$3,200.00 <br />existing backflow to new building <br />11 <br />New backflow prevention assembly & 1 LS <br />$4,725.00 <br />$4,725.00 <br />$3,260.00 <br />$3,260.00 <br />$5,500.00 <br />$5,500.00 <br />$4,600.00 <br />$4,600.00 <br />enclosure with concrete pad <br />12 <br />Replace water service between meter 1 LS <br />$3,000.00 <br />$3,000.00 <br />$1,200.00 <br />$1,200.00 <br />$3,800.00 <br />$3,800.00 <br />$2,600.00 <br />$2,600.00 <br />and existing backflow preventer <br />13 <br />Bioretention areas 1 LS <br />$31,500.00 <br />$31,500.00 <br />$9,300.00 <br />$9,300.00 <br />$17,000.00 <br />$17,000.00 <br />$13,000.00 <br />$13,000.00 <br />14 <br />Mortar rock outfall 8 EA <br />$525.00 <br />$4,200.00 <br />$990.00 <br />$7,920.00 <br />$300.00 <br />$2,400.00 <br />$500.00 <br />$4,000.00 <br />15 <br />Storm drain manholes 1 EA <br />$4,725.00 <br />$4,725.00 <br />$5,280.00 <br />$5,280.00 <br />$8,300.00 <br />$8,300.00 <br />$3,550.00 <br />$3,550.00 <br />16 <br />Storm drain cleanout 1 EA <br />$1,575.00 <br />$1,575.00 <br />$220.00 <br />$220.00 <br />$600.00 <br />$600.00 <br />$1,100.00 <br />$1,100.00 <br />17 <br />Bioretention drainage basin inlets with 2 EA <br />$3,675.00 <br />$7,350.00 <br />$735.00 <br />$1,470.00 <br />$2,400.00 <br />$4,800.00 <br />$2,100.00 <br />$4,200.00 <br />domes <br />Siempre Verde Park Rehab - Bid Summary <br />Page 1 of 12 <br />Printed 8/4/2015 @ 4:49 <br />PM <br />