BID SUMMARY
<br />PROJECT TITLE: Siempre Verde Park Rehabilitation
<br />PROJECT NO.: 2015.0270
<br />BID NO.: 14-15.026
<br />BID OPENING
<br />DATE: Monday, August 3, 2015
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 6/17/2015
<br />Prepared by: Kyle Lei
<br />Robert A. Bothman, Inc.
<br />2690 Scott Boulevard
<br />Santa Clara, CA 95050
<br />Phone: (408) 279-2277
<br />Fax: (408) 279-2286
<br />Guerra Construction
<br />984 Memorex Drive
<br />Santa Clara, CA 95050
<br />Phone: (408) 279-2027
<br />Fax: (408) 279-2044
<br />RGW Construction
<br />550 Greenville Road
<br />Livermore, Ca 94550
<br />Phone: (925) 606-2400
<br />Fax: (925) 961-1925
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />18
<br />18" catch basin with grate
<br />8 EA
<br />$2,100.00
<br />$16,800.00
<br />$700.00
<br />$5,600.00
<br />$1,600.00
<br />$12,800.00
<br />$1,650.00
<br />$13,200.00
<br />19
<br />Area drain with grate
<br />1 EA
<br />$1,050.00
<br />$1,050.00
<br />$600.00
<br />$600.00
<br />$950.00
<br />$950.00
<br />$1,800.00
<br />$1,800.00
<br />20
<br />Field inlet
<br />5 EA
<br />$4,200.00
<br />$21,000.00
<br />$1,380.00
<br />$6,900.00
<br />$1,900.00
<br />$9,500.00
<br />$2,700.00
<br />$13,500.00
<br />21
<br />8" PVC SDR -26 storm drain pipes
<br />768 LF
<br />$94.50
<br />$72,576.00
<br />$30.00
<br />$23,040.00
<br />$45.00
<br />$34,560.00
<br />$35.00
<br />$26,880.00
<br />22
<br />10" PVC SDR -26 storm drain pipes .
<br />210 LF
<br />$104.24
<br />$21,890.40
<br />$49.00
<br />$10,290.00
<br />$55.00
<br />$11,550.00
<br />$44.00
<br />$9,240.00
<br />23
<br />8" Ductile iron pipe CL 52
<br />208 LF
<br />$126.00
<br />$26,208.00
<br />$122.00
<br />$25,376.00
<br />$55.00
<br />$11,440.00
<br />$65.00
<br />$13,520.00
<br />24
<br />4" PVC SDR -35 perforated pipe
<br />43 LF
<br />$68.25
<br />$2,934.75
<br />$2.00
<br />$86.00
<br />$40.00
<br />$1,720.00
<br />$15.00
<br />$645.00
<br />25
<br />Install 3" curb drain
<br />1 LS
<br />$2,625.00
<br />$2,625.00
<br />$450.00
<br />$450.00
<br />$950.00
<br />$950.00
<br />$1,400.00
<br />$1,400.00
<br />26
<br />Concrete Paving - Pedestrian
<br />4042 SF
<br />$12.60
<br />$50,929.20
<br />$11.00
<br />$44,462.00
<br />$11.50
<br />$46,483.00
<br />$18.00
<br />$72,756.00
<br />27
<br />Concrete Paving - Vehicular
<br />16732 SF
<br />$14.70
<br />$245,960.40
<br />$10.50
<br />$175,686.00
<br />$13.50
<br />$225,882.00
<br />$19.00
<br />$317,908.00
<br />28
<br />Basketball Court Paving
<br />4250 SF
<br />$15.75
<br />$66,937.50
<br />$6.70
<br />$28,475.00
<br />$4.50
<br />$19,125.00
<br />$19.00
<br />$80,750.00
<br />29
<br />City standard sidewalk and base
<br />293 SF
<br />$15.75
<br />$4,614.75
<br />$10.00
<br />$2,930.00
<br />$13.00
<br />$3,809.00
<br />$27.00
<br />$7,911.00
<br />30
<br />City standard curb & gutter and base
<br />108 LF
<br />$36.75
<br />$3,969.00
<br />$70.00
<br />$7,560.00
<br />$47.00
<br />$5,076.00
<br />$90.00
<br />$9,720.00
<br />31
<br />Curb Ramp and base
<br />2 EA
<br />$4,200.00
<br />$8,400.00
<br />$1,450.00
<br />$2,900.00
<br />$3,000.00
<br />$6,000.00
<br />$4,600.00
<br />$9,200.00
<br />32
<br />Driveway and base
<br />128 SF
<br />$36.75
<br />$4,704.00
<br />$17.00
<br />$2,176.00
<br />$16.00
<br />$2,048.00
<br />$43.00
<br />$5,504.00
<br />33
<br />Detectable truncated domes
<br />27 SF
<br />$36.75
<br />$992.25
<br />$45.00
<br />$1,215.00
<br />$45.00
<br />$1,215.00
<br />$100.00
<br />$2,700.00
<br />34
<br />Flagstone paving on concrete base
<br />375 SF
<br />$52.50
<br />$19,687.50
<br />$33.00
<br />$12,375.00
<br />$16.00
<br />$6,000.00
<br />$26.00
<br />$9,750.00
<br />35
<br />Concrete seatwall w/ skatestops
<br />161 LF
<br />$236.25
<br />$38,036.25
<br />$172.00
<br />$27,692.00
<br />$84.00
<br />$13,524.00
<br />$350.00
<br />$56,350.00
<br />36
<br />Concrete band - 8 -inch
<br />212 LF
<br />$36.75
<br />$7,791.00
<br />$21.00
<br />$4,452.00
<br />$17.00
<br />$3,604.00
<br />$49.00
<br />$10,388.00
<br />37
<br />Concrete band - 12 -inch
<br />146 LF
<br />$42.00
<br />$6,132.00
<br />$27.00
<br />$3,942.00
<br />$20.00
<br />$2,920.00
<br />$52.00
<br />$7,592.00
<br />38
<br />Concrete band - 18 -inch
<br />45 LF
<br />$46.00
<br />$2,070.00
<br />$37.00
<br />$1,665.00
<br />$28.00
<br />$1,260.00
<br />$75.00
<br />$3,375.00
<br />39
<br />Concrete curb
<br />68 LF
<br />$34.65
<br />$2,356.20
<br />$35.00
<br />$2,380.00
<br />$25.00
<br />$1,700.00
<br />$66.00
<br />$4,488.00
<br />40
<br />Metal entrance arch
<br />1 LS
<br />$95,800.00
<br />$95,800.00
<br />$22,000.00
<br />$22,000.00
<br />$65,000.00
<br />$65,000.00
<br />$87,000.00
<br />$87,000.00
<br />41
<br />Restroom w/ storage room, incl. utilities
<br />1 LS
<br />$315,000.00
<br />$315,000.00
<br />$214,000.00
<br />$214,000.00
<br />$226,000.00
<br />$226,000.00
<br />$207,000.00
<br />$207,000.00
<br />& pad
<br />42
<br />Site electrical
<br />1 LS
<br />$131,250.00
<br />$131,250.00
<br />$97,500.00
<br />$97,500.00
<br />$107,000.00
<br />$107,000.00
<br />$125,000.00
<br />$125,000.00
<br />43
<br />Poured -in-place surfacing
<br />1 LS
<br />$168,000.00
<br />$168,000.00
<br />$128,900.00
<br />$128,900.00
<br />$105,000.00
<br />$105,000.00
<br />$119,000.00
<br />$119,000.00
<br />44
<br />Play equipment
<br />1 LS
<br />$162,750.00
<br />$162,750.00
<br />$145,000.00
<br />$145,000.00
<br />$149,000.00
<br />$149,000.00
<br />$140,000.00
<br />$140,000.00
<br />45
<br />Exercise equipment
<br />1 LS
<br />$15,750.00
<br />$15,750.00
<br />$17,000.00
<br />$17,000.00
<br />$16,500.00
<br />$16,500.00
<br />$25,000.00
<br />$25,000.00
<br />46
<br />Acrylic surfacing & lines
<br />4250 SF
<br />$1.58
<br />$6,693.75
<br />$2.10
<br />$8,925.00
<br />$3.00
<br />$12,750.00
<br />$2.00
<br />$8,500.00
<br />47
<br />Prefab steel fence, 3-1/2' high, with two
<br />1 LS
<br />$20,000.00
<br />$20,000.00
<br />$12,600.00
<br />$12,600.00
<br />$14,200.00
<br />$14,200.00
<br />$15,500.00
<br />$15,500.00
<br />gates
<br />48
<br />6' Chain Link Fence with coating
<br />24 LF
<br />$52.50
<br />$1,260.00
<br />$73.00
<br />$1,752.00
<br />$190.00
<br />$4,560.00
<br />$112.00
<br />$2,688.00
<br />49
<br />4' Chain Link Fence with coating
<br />152 LF
<br />$42.00
<br />$6,384.00
<br />$38.00
<br />$5,776.00
<br />$47.00
<br />$7,144.00
<br />$46.00
<br />$6,992.00
<br />50
<br />4' Chain Link gate with coating
<br />1 EA
<br />$1,470.00
<br />$1,470.00
<br />$629.00
<br />$629.00
<br />$600.00
<br />$600.00
<br />$1,400.00
<br />$1,400.00
<br />Siempre Verde Park Rehab - Bid Summary Page 2 of 12 Printed 8/4/2015 @ 4:49 PM