Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Siempre Verde Park Rehabilitation <br />PROJECT NO.: 2015.0270 <br />BID NO.: 14-15.026 <br />BID OPENING <br />DATE: Monday, August 3, 2015 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 6/17/2015 <br />Prepared by: Kyle Lei <br />Robert A. Bothman, Inc. <br />2690 Scott Boulevard <br />Santa Clara, CA 95050 <br />Phone: (408) 279-2277 <br />Fax: (408) 279-2286 <br />Guerra Construction <br />984 Memorex Drive <br />Santa Clara, CA 95050 <br />Phone: (408) 279-2027 <br />Fax: (408) 279-2044 <br />RGW Construction <br />550 Greenville Road <br />Livermore, Ca 94550 <br />Phone: (925) 606-2400 <br />Fax: (925) 961-1925 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />18 <br />18" catch basin with grate <br />8 EA <br />$2,100.00 <br />$16,800.00 <br />$700.00 <br />$5,600.00 <br />$1,600.00 <br />$12,800.00 <br />$1,650.00 <br />$13,200.00 <br />19 <br />Area drain with grate <br />1 EA <br />$1,050.00 <br />$1,050.00 <br />$600.00 <br />$600.00 <br />$950.00 <br />$950.00 <br />$1,800.00 <br />$1,800.00 <br />20 <br />Field inlet <br />5 EA <br />$4,200.00 <br />$21,000.00 <br />$1,380.00 <br />$6,900.00 <br />$1,900.00 <br />$9,500.00 <br />$2,700.00 <br />$13,500.00 <br />21 <br />8" PVC SDR -26 storm drain pipes <br />768 LF <br />$94.50 <br />$72,576.00 <br />$30.00 <br />$23,040.00 <br />$45.00 <br />$34,560.00 <br />$35.00 <br />$26,880.00 <br />22 <br />10" PVC SDR -26 storm drain pipes . <br />210 LF <br />$104.24 <br />$21,890.40 <br />$49.00 <br />$10,290.00 <br />$55.00 <br />$11,550.00 <br />$44.00 <br />$9,240.00 <br />23 <br />8" Ductile iron pipe CL 52 <br />208 LF <br />$126.00 <br />$26,208.00 <br />$122.00 <br />$25,376.00 <br />$55.00 <br />$11,440.00 <br />$65.00 <br />$13,520.00 <br />24 <br />4" PVC SDR -35 perforated pipe <br />43 LF <br />$68.25 <br />$2,934.75 <br />$2.00 <br />$86.00 <br />$40.00 <br />$1,720.00 <br />$15.00 <br />$645.00 <br />25 <br />Install 3" curb drain <br />1 LS <br />$2,625.00 <br />$2,625.00 <br />$450.00 <br />$450.00 <br />$950.00 <br />$950.00 <br />$1,400.00 <br />$1,400.00 <br />26 <br />Concrete Paving - Pedestrian <br />4042 SF <br />$12.60 <br />$50,929.20 <br />$11.00 <br />$44,462.00 <br />$11.50 <br />$46,483.00 <br />$18.00 <br />$72,756.00 <br />27 <br />Concrete Paving - Vehicular <br />16732 SF <br />$14.70 <br />$245,960.40 <br />$10.50 <br />$175,686.00 <br />$13.50 <br />$225,882.00 <br />$19.00 <br />$317,908.00 <br />28 <br />Basketball Court Paving <br />4250 SF <br />$15.75 <br />$66,937.50 <br />$6.70 <br />$28,475.00 <br />$4.50 <br />$19,125.00 <br />$19.00 <br />$80,750.00 <br />29 <br />City standard sidewalk and base <br />293 SF <br />$15.75 <br />$4,614.75 <br />$10.00 <br />$2,930.00 <br />$13.00 <br />$3,809.00 <br />$27.00 <br />$7,911.00 <br />30 <br />City standard curb & gutter and base <br />108 LF <br />$36.75 <br />$3,969.00 <br />$70.00 <br />$7,560.00 <br />$47.00 <br />$5,076.00 <br />$90.00 <br />$9,720.00 <br />31 <br />Curb Ramp and base <br />2 EA <br />$4,200.00 <br />$8,400.00 <br />$1,450.00 <br />$2,900.00 <br />$3,000.00 <br />$6,000.00 <br />$4,600.00 <br />$9,200.00 <br />32 <br />Driveway and base <br />128 SF <br />$36.75 <br />$4,704.00 <br />$17.00 <br />$2,176.00 <br />$16.00 <br />$2,048.00 <br />$43.00 <br />$5,504.00 <br />33 <br />Detectable truncated domes <br />27 SF <br />$36.75 <br />$992.25 <br />$45.00 <br />$1,215.00 <br />$45.00 <br />$1,215.00 <br />$100.00 <br />$2,700.00 <br />34 <br />Flagstone paving on concrete base <br />375 SF <br />$52.50 <br />$19,687.50 <br />$33.00 <br />$12,375.00 <br />$16.00 <br />$6,000.00 <br />$26.00 <br />$9,750.00 <br />35 <br />Concrete seatwall w/ skatestops <br />161 LF <br />$236.25 <br />$38,036.25 <br />$172.00 <br />$27,692.00 <br />$84.00 <br />$13,524.00 <br />$350.00 <br />$56,350.00 <br />36 <br />Concrete band - 8 -inch <br />212 LF <br />$36.75 <br />$7,791.00 <br />$21.00 <br />$4,452.00 <br />$17.00 <br />$3,604.00 <br />$49.00 <br />$10,388.00 <br />37 <br />Concrete band - 12 -inch <br />146 LF <br />$42.00 <br />$6,132.00 <br />$27.00 <br />$3,942.00 <br />$20.00 <br />$2,920.00 <br />$52.00 <br />$7,592.00 <br />38 <br />Concrete band - 18 -inch <br />45 LF <br />$46.00 <br />$2,070.00 <br />$37.00 <br />$1,665.00 <br />$28.00 <br />$1,260.00 <br />$75.00 <br />$3,375.00 <br />39 <br />Concrete curb <br />68 LF <br />$34.65 <br />$2,356.20 <br />$35.00 <br />$2,380.00 <br />$25.00 <br />$1,700.00 <br />$66.00 <br />$4,488.00 <br />40 <br />Metal entrance arch <br />1 LS <br />$95,800.00 <br />$95,800.00 <br />$22,000.00 <br />$22,000.00 <br />$65,000.00 <br />$65,000.00 <br />$87,000.00 <br />$87,000.00 <br />41 <br />Restroom w/ storage room, incl. utilities <br />1 LS <br />$315,000.00 <br />$315,000.00 <br />$214,000.00 <br />$214,000.00 <br />$226,000.00 <br />$226,000.00 <br />$207,000.00 <br />$207,000.00 <br />& pad <br />42 <br />Site electrical <br />1 LS <br />$131,250.00 <br />$131,250.00 <br />$97,500.00 <br />$97,500.00 <br />$107,000.00 <br />$107,000.00 <br />$125,000.00 <br />$125,000.00 <br />43 <br />Poured -in-place surfacing <br />1 LS <br />$168,000.00 <br />$168,000.00 <br />$128,900.00 <br />$128,900.00 <br />$105,000.00 <br />$105,000.00 <br />$119,000.00 <br />$119,000.00 <br />44 <br />Play equipment <br />1 LS <br />$162,750.00 <br />$162,750.00 <br />$145,000.00 <br />$145,000.00 <br />$149,000.00 <br />$149,000.00 <br />$140,000.00 <br />$140,000.00 <br />45 <br />Exercise equipment <br />1 LS <br />$15,750.00 <br />$15,750.00 <br />$17,000.00 <br />$17,000.00 <br />$16,500.00 <br />$16,500.00 <br />$25,000.00 <br />$25,000.00 <br />46 <br />Acrylic surfacing & lines <br />4250 SF <br />$1.58 <br />$6,693.75 <br />$2.10 <br />$8,925.00 <br />$3.00 <br />$12,750.00 <br />$2.00 <br />$8,500.00 <br />47 <br />Prefab steel fence, 3-1/2' high, with two <br />1 LS <br />$20,000.00 <br />$20,000.00 <br />$12,600.00 <br />$12,600.00 <br />$14,200.00 <br />$14,200.00 <br />$15,500.00 <br />$15,500.00 <br />gates <br />48 <br />6' Chain Link Fence with coating <br />24 LF <br />$52.50 <br />$1,260.00 <br />$73.00 <br />$1,752.00 <br />$190.00 <br />$4,560.00 <br />$112.00 <br />$2,688.00 <br />49 <br />4' Chain Link Fence with coating <br />152 LF <br />$42.00 <br />$6,384.00 <br />$38.00 <br />$5,776.00 <br />$47.00 <br />$7,144.00 <br />$46.00 <br />$6,992.00 <br />50 <br />4' Chain Link gate with coating <br />1 EA <br />$1,470.00 <br />$1,470.00 <br />$629.00 <br />$629.00 <br />$600.00 <br />$600.00 <br />$1,400.00 <br />$1,400.00 <br />Siempre Verde Park Rehab - Bid Summary Page 2 of 12 Printed 8/4/2015 @ 4:49 PM <br />