My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2015 1102
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 1102
>
8B Consent 2015 1102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 8:56:44 AM
Creation date
10/27/2015 5:39:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/2/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 1102 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 1102
Reso 2015-179
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
42 <br />3. Work Program/Project Schedule <br />Proposal for San Leandro Creek Trail Master Plan <br />Schedule <br />The Caltrans grant indicated the fi nal plan’s <br />completion date as September 2016. Assuming <br />an authorization in September 2015, that <br />allows for less than 12 months. This is an <br />achievable, albeit tight, deadline. We recently <br />completed a safety study with Complete Street <br />improvements that maintained an aggressive <br />six-month schedule with outreach included. <br />We also feel that committee meetings could <br />potentially be moved from every other month <br />2015 2016 <br />Task Sep Oct Nov Dec Jan Feb Mar Apr Jan July Aug Sep Oct Nov <br />Task 0 – Project Management <br />Task 1 – Data Collection and <br />Analysis <br /> 1.1 Data Collection <br /> 1.2 Base Maps <br /> 1.3 Existing Analysis <br />Task 2 - Public Outreach and <br />Committee Meetings <br /> 2.1 Review of Existing Outreach <br /> 2.2 Prepare Updated Plan <br /> 2.3 Technical Information <br /> 2.4/2.5 Workshops/Meetings <br />Task 3 - Plan Development <br /> 3.1 Draft Master Plan <br /> 3.2 Final Master Plan <br />Task 4 - Plan Presentation <br /> 4.1 Preparation <br /> 4.2 Presentation to Councils <br />123456789 1 0 1 11 21 3 1 4 1 5 <br />Schedule Notes: <br />• Task 1 will be ongoing management <br />throughout the life of the project. The <br />kickoff meeting will be scheduled <br />immediately upon authorization <br />• Task 3 includes approximately 2-4 weeks <br />time to allow review by stakeholders. <br />It also includes time to respond to <br />comments before fi nalization. <br />to monthly. However, creative public outreach <br />can be time-consuming and we would be <br />happy to extend the project schedule at <br />the City’s direction. Our preliminary project <br />schedule is shown below with a compressed <br />outreach schedule and completion of the plan <br />by September 2016. A more fi nalized project <br />schedule will be created after the kick-off <br />meeting and will be maintained throughout the <br />life of the project.
The URL can be used to link to this page
Your browser does not support the video tag.