Laserfiche WebLink
10.9 Contract Administration. This Agreement shall be administered by Kyle K. Lei ("Contract <br /> Administrator"). All correspondence shall be directed to or through the Contract <br /> Administrator or his or her designee. <br /> 10.10 Notices. Any written notice to Consultant shall be sent to: <br /> Bill Harris,ASLA <br /> Harris Design <br /> 755 Folger Avenue <br /> Berkeley, CA 94710 <br /> Any written notice to City shall be sent to: <br /> Kyle K. Lei <br /> Engineering and Transportation Department <br /> City of San Leandro <br /> 835 E. 14th Street <br /> San Leandro, CA 94577 <br /> With a copy to: <br /> City of San Leandro <br /> Department of Finance <br /> do Purchasing Technician <br /> 835 East 14th Street <br /> San Leandro, CA 94577 <br /> 10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br /> the first page of a technical report,first page of design specifications, and each page of <br /> construction drawings shall be stamped/sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br /> "Seal and Signature of Registered Professional with report/design responsibility,"as in the <br /> following example. <br /> Seal and Signature of Registered Professional with <br /> report/design responsibility. <br /> 10.12 Integration. This Agreement, including the scope of work attached hereto and <br /> incorporated herein as Exhibits A, B, and C and D represents the entire and integrated <br /> agreement between City and Consultant and supersedes all prior negotiations, <br /> representations, or agreements, either written or oral. <br /> Exhibit A Scope of Services <br /> Exhibit B Compensation Schedule&Reimbursable Expenses <br /> Consulting Services Agreement between City of <br /> San Leandro and Harris Design Page 13 of 24 <br />