My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2016 0307
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0307
>
8F Consent 2016 0307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:14:44 PM
Creation date
3/1/2016 11:38:29 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/7/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0307 CSAmended+RGAmended
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0307
Reso 2016-035
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-026 <br />The total project cost was approximately $1.34M, including design, construction management, <br />inspection, and construction contingencies. <br />Budget Authority <br />This project was funded from the following appropriations: <br />·$835,966.00 from Measure B Streets and Roads in account No. 144-38-353 <br />appropriated in the FY 2014-15 budget. <br />·$304,705.00 from Vehicle Registration Fees in Account No. 143-38-353 appropriated in <br />the FY 2014-15 budget. <br />· $60,000.00 from Residential Street Set Aside in Account No. 142-38-357, <br />appropriated in the FY 2013-14 budget. <br />·$20,600.00 from Neighborhood Traffic Calming Program in Account No. 120-28-167 <br />which was included in the $50,000.00 originally appropriated in the FY 2014-15 budget. <br />·$136,950.00 from the Developer Fees for Street Improvements (DFSI) fund balance <br />appropriated to Account No. 120-28-167, as per Resolution 2015-110. <br />ATTACHMENT <br />·Presentation poster of the street reconstruction process. <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 3/1/2016
The URL can be used to link to this page
Your browser does not support the video tag.