My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2016 0404
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0404
>
8D Consent 2016 0404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:07:30 PM
Creation date
3/31/2016 10:48:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/4/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0404 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0404
Reso 2016-040
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 3/4/2016 <br />BKF Engineers Exhibit A – Page 19 of 24 <br />Consultant shall prepare the 100% PS&E documents to address comments from the Focus Meeting, <br />Design Coordination Meeting #2 and the Caltrans review of the 70% PS&E. Construction details will be <br />finalized as part of Task 5. The individual design components shall undergo an in-house review by the <br />Consultant to check for completeness and compliance to standards to ensure a complete and constructible <br />design package. Consultant shall conduct additional site investigations prior to completion of the 100% <br />PS&E to ensure existing conditions are depicted accurately. <br /> <br />The City will submit the 100% PS&E to Caltrans for review if needed. <br /> <br />Deliverables (due 4 weeks after Design Coordination Meeting #2 or receipt of Caltrans review comments <br />on the 70% PS&E, whichever occurs later): <br />- 100% plans in PDF and AutoCAD formats. Plans shall be 34” by 22” in size (ANSI D) on City title <br />block <br />- 100% technical specifications in Microsoft Word <br />- 100% cost estimate in Microsoft Excel <br /> <br />Task 6 – Final PS&E <br />Consultant shall prepare the final PS&E documents to address review comments on the 100% PS&E. <br />Consultant shall conduct a final QA/QC review of the PS&E documents to ensure all design elements are <br />thoroughly addressed. <br /> <br />Deliverables shall be signed and stamped by the Consultant and/or Subconsultant (due 3 weeks after <br />Consultant receives review comments on the 100% PS&E): <br />- Final plans in PDF and AutoCAD formats. Plans shall be 34” by 22” in size (ANSI D) <br />- Final technical specifications in Microsoft Word <br />- Final cost estimate in Microsoft Excel
The URL can be used to link to this page
Your browser does not support the video tag.