My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2016 0404
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0404
>
8D Consent 2016 0404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:07:30 PM
Creation date
3/31/2016 10:48:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/4/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0404 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0404
Reso 2016-040
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-667 <br />design phase of the project. <br />Summary of Public Outreach Efforts <br />At least one public meeting will be held with the neighborhood during the design phase. <br />Fiscal Impacts <br />The total project cost, including studies, design, construction, construction management, and <br />inspection is $1,397,134.00. <br />The subject contract is $97,490.00. If change orders are needed, the total amount of contract <br />change orders authorized by this action is $24,372.50. However, change orders beyond the <br />project budget will not be done until adequate funding is allocated towards this project at a <br />later date with the ROPS. <br />Budget Authority <br />Funding allocations for the MacArthur/Superior Traffic Circle Design Project are as follows: <br />1) $80,000.00 - General Fund, MacArthur/Superior Traffic Circle Design Project, Account No. <br />210-28-193, allocated in FY 2013-14 <br />2) $43,000.00 - Development Fee for Street Improvements Fund, MacArthur/Superior Traffic <br />Circle Design Project, Account No. 120-28-193, allocated in FY 2013-14 <br />3) $10,000 - General Fund, Miscellaneous Engineering Studies, Account 210-38-290, <br />allocated in FY 2012-13 <br />ATTACHMENT(S) <br />·CSA - BKF - Roundabout PS&E <br />PREPARED BY: Kyle K. Lei, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 3/29/2016
The URL can be used to link to this page
Your browser does not support the video tag.