My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2016 0404
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0404
>
8F Consent 2016 0404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:07:47 PM
Creation date
3/31/2016 10:49:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/4/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0404 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0404
Reso 2016-041
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-100 <br />diversity of San Leandro. Staff also notified contractors interested in working with the City via <br />email and sent plans to bid shops and plan rooms. <br />The contractor notified residents and businesses whose properties were directly impacted by <br />construction by passing out flyers and talking to them in person. <br />Fiscal Impacts <br />The updated total project cost including design, contingency and construction management is <br />estimated to be $1,691,510.04 assuming the final contract change order percentage is 40%. <br />An increase in appropriation is necessary for this project in the amount of $291,510.04. <br />Budget Authority <br />This project will be funded as follows: <br />Previous allocations: <br />1) $500,000.00 - Water Pollution Control Enterprise Funds, Sanitary Sewer Line <br />Replacement/Repair 2012-13, Account No. 593-52-253, allocated in FY 2012-13 <br />2) $600,000.00 - Water Pollution Control Enterprise Funds, Sanitary Sewer Line <br />Replacement/Repair 2013-14, Account No. 593-52-256, allocated in FY 2013-14 <br />3) $20,488.00 - Measure B Funds, Storm Drain Outfall Repair, Account No. 144-38-340, <br />allocated in FY 2014-15 <br />4) $279,512.00 - Water Pollution Control Enterprise Funds Adjustment, Account No. 593- <br />52-253, Council approved appropriation via Resolution NO. 2015-083 <br />Funding appropriation request of City Council: <br />$291,510.04 appropriated from the Water Pollution Control Enterprise Fund balance to <br />complete the Sanitary Sewer Line Replacement/Repair 2012-13 Project. <br />ATTACHMENT <br />None. <br />PREPARED BY: Kyle K. Lei, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 3/29/2016
The URL can be used to link to this page
Your browser does not support the video tag.