My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2016079227
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2016
>
Inst 2016079227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2016 10:22:17 AM
Creation date
4/27/2016 10:22:16 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/13/2016
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, replacement of plant materials and irrigation equipment as needed to preserve the <br /> healthy and appearance of plant materials. <br /> E. Barbed or razor wire shall not be installed on any fence or buildings on the project <br /> site. <br /> V. ENGINEERING AND TRANSPORTATION DEPARTMENT REQUIREMENTS <br /> A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1),the <br /> City HEREBY NOTIFIES the applicant for this Project that the 90-day approval <br /> period(in which the applicant may protest the imposition of any fees, dedications, <br /> reservations, or other exactions imposed on this Project by these Conditions of <br /> Approval) will begin on the date of the conditional approval of this Project. If you <br /> fail to file a protest within this 90-day period, complying with all of the <br /> requirements of Government Code Section 66020, you will be legally barred from <br /> later challenging any such fees, dedications, reservations or other exactions. <br /> B. The proposed development shall comply with City ordinances, policies and <br /> regulations. All improvements shall be in accordance with the City's Design <br /> Standards, Specifications and Standard Plans unless otherwise specifically <br /> approved by the City Engineer. <br /> C. Site Improvement Plans for all on-site and off-site improvements shall be <br /> designed and stamped by a civil engineer registered to practice within the State of <br /> California, and approved by the City Engineer prior to the issuance of Building <br /> Permits for the project. All improvements shall be designed and constructed in <br /> accordance with the City's Design Standards, Specifications and Standard Plans, <br /> unless otherwise specifically approved by the City Engineer. <br /> D. Prior to the issuance of the Building Permit, the property owner shall pay the <br /> Sewer Connection fee, Engineering Review and Inspection Fees, and other fees as <br /> required by City Ordinances and regulations. <br /> E. The applicant shall construct any new utilities via underground facilities. <br /> F. The applicant shall remove any broken and uplifted driveway, sidewalk, curb and <br /> gutter along the full project frontage and shall construct new City standard <br /> driveway, sidewalk, curb and gutter in the same location and alignment as the <br /> existing facilities prior to issuance of Certificate of Occupancy. <br /> G. All abandoned driveways shall be removed and replaced with City standard <br /> sidewalk, curb and gutter prior to issuance of Certificate of Occupancy. <br /> H. Prior to the issuance of building permits for the project, the Applicant shall obtain <br /> an Encroachment Permit from the Engineering and Transportation Department for <br /> any work within the public right-of-way. <br /> Agreement to Conditions January 13,2016 <br /> PLN15-0050 Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.