Laserfiche WebLink
Current Fee Refer <br />ence PROPOSED FEEDescription EXPLANATION <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />8 Miscellaneous (Continued) <br />E. Fire Permit Re-inspection Processing Fee 50 percent of fire permit filing and issuance fee <br />Plan Storage: <br />New single-family and two- family residential building $21.60 22.20$ CPI 2.6% <br />All other new buildings $27.70 28.50$ CPI 2.6% <br />Additions, alterations, or repairs $27.70 28.50$ CPI 2.6% <br />Class C Roofs:F. Fire Permit - Class C Roof <br />From - To and Including <br />$1.00 - $500.00 $147.00 151.00$ CPI 2.6% <br />$501.00 - $2,000.00 $151/$8.70 CPI 2.6% <br />$2,001.00 - $25,000.00 $280/$28.50 CPI 2.6% <br />$25,001.00 - $50,000.00 $936/$25.90 CPI 2.6% <br />$50,000.00+ $1,542/$19.60 CPI 2.6% <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$147.00 for the first $500 plus $8.45 for each additional $100 or <br />fraction thereof, to and including $2,000.00 <br />$273.00 for the first $2,000.00 plus $27.75 for each additional <br />$1,000.00 or fraction thereof, to and including $25,000.00 <br />$912.00 for the first $25,000 plus $25.20 for each additional $1,000.00 <br />or fraction thereof, to and including $50,000 <br />$1,542.00 for the first $50,000 plus $19.10 each additional $1,000.00 <br />or fraction thereof <br /> 10