Laserfiche WebLink
Current Fee Refer <br />ence PROPOSED FEEDescription EXPLANATION <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />8 Miscellaneous <br />A. Inspection Fees <br />Fees for inspection not otherwise set forth herein Direct Cost (1) <br />Courtesy Inspection for projects that are awaiting permit issuance <br />pending completion of plan review <br />$269/$393 CPI 2.6% <br />Fees for inspection conducted outside of normal business hours <br />B. Extra Inspection Fees <br />(1) Deficient or defective work, or otherwise through fault or error on <br />the part of the holder of permit or his/her employees <br />One inspection made under the regular fees as provided herein <br />Each and every further extra inspection visit Direct Cost (1) with a minimum of one hour <br />(2) Incorrect Address or location of work Direct Cost (1) with a minimum of one-half hour <br />(3) Amending application to increase the number of devices <br />authorized for installation or repair after permit has been issued and <br />before any inspection of work is made: <br />Fees as stated herein for additional installations <br />(4) Investigation fee for work commenced without first obtaining <br />permits as required by the San Leandro Municipal Code, whether or <br />not a permit is subsequently issued <br />(5) Code Compliance Inspections at the request of the property <br />owner. <br />Direct Cost (1) with a minimum of one hour <br />(6) Investigation Fee for conditions that are not in compliance with the <br />San Leandro Zoning and/or Municipal Codes <br />Direct Cost(1) <br />C. Other Fees and Charges <br />Automation Update Fee 6% of Permit Fee, Minimum $6.00 per permit type 6.20$ CPI 2.6% <br />Strong Motion Impact Fee: State mandated tax for the Seismic Safety <br />Commission for seismic monitoring. Collected for the State by the City. <br />Building Standards Commission (SB1473) Fee: State Mandated tax for <br />Green Building Standards collected for the State by the City. <br />Exception to Noise Ordinance $437.00 448.00$ CPI 2.6% <br />Certificate of Occupancy Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />Temporary Certificate of Occupancy per 30 days Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />Certificate of Compliance:Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />Single-family dwelling Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />Two-family dwelling Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />All others Direct Costs (1) , with minimum of $147.00 151.00$ CPI 2.6% <br />House Moving Permit Direct Costs (1) plus mileage, with minimum of $147.00 151.00$ CPI 2.6% <br />File retrieval and refiling (no staff assistance)$7.40 7.60$ CPI 2.6% <br />Microfilm Copies $1.15 1.20$ CPI 2.6% <br />Photocopies $0.10 per page No change <br />Staff assistance with file contents Direct Costs (1) <br />Microfilming of Permit and Plans includes imaging fee for fire permits: <br />(For purposes of fee charges, each permit is considered a drawing) <br />8-1/2 x 11 or 11 x 14 drawings including fire permits $ 1.80 per sheet 1.90$ CPI 2.6% <br />All other size drawings $ 2.05 per sheet 2.10$ CPI 2.6% <br />Appeals Direct Costs (1) <br />D. Fire Permit Filing and Issuance Fee $97.00 plus applicable fees from the Fire Dept. Fee Section 100.00$ CPI 2.6% <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$262 for inspections during normal business hours and $383 for <br />inspections outside normal business hours <br />Rate equal to 1.5 times the Direct Cost (1) with a minimum fee of two <br />Residential: .0010 per $10.00 Valuation or fraction thereof with a <br />$0.50 min. Commercial:/Industrial: .0021 per $10.00 Valuation or <br />fraction thereof with a $.50 min. <br />All Residential, Commercial, and Industrial permits that use Valuation <br />to determine permit fees: $1.00 per $25,000 valuation or fraction <br />thereof with a $1.00 minimum. <br />Fee equal to three (3) times the minimum fees PLUS any required <br />permit fee <br />Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the <br />execution of the work nor from any other penalties prescribed by law. <br /> 9