My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2016-047
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2016
>
Reso 2016-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 6:56:33 PM
Creation date
5/5/2016 11:15:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/2/2016
Retention
PERM
Document Relationships
4C Public Hearing 2016 0502
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description Current Fee Reference <br /> COMMUNITY DEVELOPMENT DEPARTMENT-Building Regulations Division(continued) <br /> 5 Heating,Ventilating and Air Condition or General Mechanical (Continued) <br /> Fans or blowers connected to any heating system which are not part of $9.90 <br /> the furnace each <br /> Commercial range hoods including vent each $37.00 <br /> Flues: <br /> Minimum(one or two flues) $11.50 <br /> Each flue over two(each) $7.10 <br /> Ventilating System for Kitchen,Bath,etc.: <br /> Minimum(one or two systems) $11.50 <br /> Each system over two $9.90 <br /> General Mechanical: <br /> Incinerators-domestic,each $16.70 <br /> Incinerators-commercial/industrial,each $65.30 <br /> Garbage chutes,each $21.50 <br /> Fire dampers,each $9.90 <br /> Smog control after burners,commercial/industrial,each system $44.50 <br /> Refrigeration system-commercial/industrial,each system $56.80 <br /> Condensate drain system,each inlet $4.40 <br /> Boilers: <br /> All sizes $79.10 <br /> Heat pumps,each $25.60 <br /> Cooling Systems: <br /> To 100,000 BTU each $22.50 <br /> Over 100,000 to 500,000 BTU,each $35.40 <br /> Over 500,000 to 1,000,000 BTU,each $46.80 <br /> Over 1,000,000 BTU,each $58.10 <br /> Evaporative Cooler,each $23.40 <br /> Industrial Processing Equipment: <br /> Ovens,dryers,cookers,fryers,kettles,etc.each $37.00 <br /> Industrial processing exhaust systems,each system $37.00 <br /> Manufactured spray booths,each $37.00 <br /> Energy Conservation: review of plans and/or energy forms for all buildings Direct Cost(1)with a minimum charge of$66.00 <br /> subject to the California Energy Commission's conservation regulations <br /> when not covered by building permit) <br /> 6 Signs <br /> Filing and Issuance Fee $100.00 plus fees shown below. Fees for sign permits are in <br /> addition to any required electrical permit fees <br /> Sign permit fees are flat rate as indicated below and based on all signs being on the same property and on the same permit. Rates include <br /> review and inspection <br /> 1 to 2 signs(non electric,attached to building) $158.00 <br /> 3 to 4 signs(non electric,attached to building) $237.00 <br /> 5 plus signs(non electric,attached to building) $316.00 <br /> Monument signs(each) $211.00 <br /> Electric self-contained signs,initially installed bearing Underwriters'label $29.80 <br /> of approval,each <br /> Relocation or alteration of any sign electronically or mechanically,but not $79.00 <br /> including replacement of tubing,transformers and such parts subject to <br /> failure;or shop inspection by the local inspection department in lieu of a UL <br /> label(a local electrical inspection department label of approval shall be <br /> required),each <br /> 7 Excavation and Grading <br /> Minimum Fee $75.00 PLUS the fees shown in the fee schedule as adopted by the <br /> City Council except that wherever an hourly rate is shown,the rate <br /> shall be equal to the Direct Cost(1)or whichever is greater. <br /> Plan Checking $75.00 PLUS the fees shown in the fee schedule as adopted by the <br /> City Council except that wherever an hourly rate is shown,the rate <br /> shall be equal to the Direct Cost(1)or whichever is greater. <br /> trect Cost=hourtypersonnel charge plus a factorof 100%forfringe benefirs,ovemead and indirect costs <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.