Laserfiche WebLink
Description Current Fee Reference <br /> COMMUNITY DEVELOPMENT DEPARTMENT-Building Regulations Division(continued) <br /> 4 Plumbing Permit (Continued) <br /> Septic tank outfit complete(installation or removal/abandonment),each $65.60 <br /> Sewer extension,each $22.30 <br /> Site sewer lateral between building and street main,new or repairs or $41.90 <br /> abandonment <br /> Tempora privy or vault chemical toilet),each $19.10 <br /> Gray Water Systems(fee to cover review of plans and inspection of $152.00 <br /> the installed system) <br /> Gas Piping and Oil Piping: <br /> Minimum Fee(one or two outlets) $7.70 <br /> Exemption: Inspection of installation of an earthquake gas shutoff valve No minimum gas piping and oil piping fee <br /> Each gas outlet over two $4.40 <br /> Each gas meter over one(same time and place) $5.70 <br /> Gas line test,each test $15.40 <br /> Fuel oil or liquefied petroleum gas storage tanks,demolition of new $8.40 <br /> tanks and piping to building,each <br /> Clothes dryer-residential,each $9.90 <br /> Clothes dryer-commercial,each $12.00 <br /> Hot Waters stems,piping and equipment- <br /> For steam or hot water heating piping and radiators,convectors,hot water panels,steam or hot water unit heaters,clothes pressing <br /> machines of any type,and all connection to industrial and processing equipment: <br /> Minimum fee first device $9.90 <br /> Each additional device $12.60 <br /> Boilers:All Sizes $79.10 <br /> Solar system,including collectors,piping,tanks&exchanger,each $5120 <br /> Energy Conservation: review of plans and/or energy forms for all Direct Cost(1)with a minimum charge of$66.00 <br /> buildings subject to the California Energy Commission's conservation <br /> regulations when not covered by building permit) <br /> 5 Heating,Ventilating and Air Condition or General Mechanical <br /> Filing and Issuance Fee $100.00 plus the amount shown for each heating,ventilating,and air <br /> conditioning item of work and each general mechanical item of work <br /> For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system,including air inlet or outlet connections, <br /> registers and diffusers: <br /> Plan Check,when applicable Direct Cost(1) <br /> For Construction and additions with valuations over$100,000 including all 10%of Building Permit Fee <br /> HVAC registers,ducts gas line and vents. <br /> Each register over two $3.20 <br /> Heating,cooling and ventilating appliances- <br /> Gravity <br /> liances-Gravi or forced air furnace,each (including as fireplace inserts) $16.40 <br /> Residential air conditioning system $14.30 <br /> Unit heater,each $14.30 <br /> Recessed wall heater,each $14.30 <br /> Suspended space heater,each $14.30 <br /> Gas range-domestic,each $9.90 <br /> Gas range-commercial,each $12.00 <br /> Gas clothes dryer,domestic,each $9.90 <br /> Gas clothes dryer,commercial,each $12.00 <br /> Gas domestic refrigerator,each $9.90 <br /> Conversion burner,each $12.00 <br /> Circulating a room heater,each $12.00 <br /> Industrial and commercial heating equipment,each $16.90 <br /> Alterations or changes of any control system or ventilating system from $14.30 <br /> original installation <br /> Small burner of not over 15,000 BTU per hour,steam table sterilizers, $9.90 <br /> laboratory burners,coffee urn burners,gas plates and similar devices,each <br /> 1 Direct Cost=hourly personnel charge plus a factor of 100%for fringe benefits,overhead and indirect costs <br /> 8 <br />