Laserfiche WebLink
Performance Summary For 27T <br />Project: Climatec Energy - City of San Leandro 01/15/2016 <br />Prepared By: 02:54PM <br />Supply System Curve <br />4 <br />1 <br />11 <br />RVI <br />3 <br />7 <br />11-1 <br />11 <br />600ROM <br />\ <br />25 <br />BHP <br />IRA <br />1 <br />100 <br />1 <br />C(I <br />BHP <br />\ <br />r <br />.5013H <br />°00 <br />P <br />3. <br />P <br />2708 <br />200 <br />P 0 <br />P <br />0 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />27 <br />Airflow(CFM-thousands) <br />RPM=891 BHP=7.80MaximumRPM=1200MaximumHP=23.40 <br />S C- System Curve RP-RatedPoA <br />Applied Rooftop Builder 3.19m Page 9 of 48 <br />