Laserfiche WebLink
Rain Bird controller will also have the capacity for future upgrade to remote control capability, but this <br />was not included in this project due to ongoing costs involved. <br />Hook up existing flow sensor to new controller. If any major issues are discovered during the <br />construction phase while uncovering the existing system, the issues will be compiled in a brief report and <br />submitted to the City for further action. <br />Water Pollution Control Plant / New Admin Building <br />Lighting <br />Retrofit existing outdoor HID fixtures to new, high -efficiency LED fixtures which will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Retrofit existing indoor high bay HID fixtures to new, high -efficiency LED fixtures which will provide <br />long life and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Bonaire Park <br />Lighting <br />Retrofit existing outdoor HID fixtures to new, high -efficiency LED fixtures which will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Irrigation <br />Retrofit existing irrigation controller to Calsense weather -based irrigation controller. New controller will <br />provide water savings by automatically adjusting station run times based on weather conditions, as well <br />as providing remote control capability. Weather/ evapotranspiration (ET) data will be received by the <br />irrigation controller via cellular radio. Scope of work includes demo of old controller, installation, wiring, <br />programming, and testing of new controller. New controller's base programming will match the <br />programming of the old controller as much as possible unless otherwise requested by City personnel. <br />Install a brass flow sensor / master valve assembly capable of detecting an unexpected high flow event <br />(rupturedpipe) and responding by shutting off the water supply. Scope includes the installation of the <br />flow sensor, interlock to the master valve, typical trenching requirements and start-up/testing of the new <br />system. If any major issues are discovered during the construction phase while uncovering the existing <br />system, the issues will be compiled in a beef report and submitted to the City for further action. <br />Grover Cleveland Park <br />Lighting <br />Retrofit existing outdoor HID fixtures to new, high -efficiency LED fixtures which will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Irrigation <br />Retrofit existing irrigation controller to Rain Bird weather based irrigation controller. New controller <br />will provide water savings by automatically adjusting station run times based on weather conditions. <br />Weather/evapotranspiration (ET) data will be received by the irrigation controller from an existing, local <br />p City of San Leandro <br />a_ CLIMATEC Installation Agreement — Att A <br />' - Page 7 of 12 <br />