My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
4A Public Hearing 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:04:41 AM
Creation date
5/11/2016 5:29:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-054
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Install a brass flow sensor / master valve assembly capable of detecting an unexpected high flow event <br />(ruptured pipe and responding by shutting off the water supply. Scope includes the installation of the <br />flow sensor, interlock tc the master valve, typical trenching requirements and start-up/testing of the new <br />system. If any major issues are discovered during the construction phase while uncovering the existing <br />system, the issues wll be compiled in a brief report and submitted to the City for further action. <br />Memorial Park <br />Lighting <br />' Retrofit existing outdoor HID fixtures to new, high- efficiency LED fixtures which will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Irrigation <br />Retrofit existing irrigation controller to Rain Bird weather based irrigation controller. New controller <br />will provide water savings by automatically adjusting station run times based on weather conditions. <br />Weather/evapotranspiration (ET) data will be received by the irrigation controller from an existing, local <br />weather station via radio. Scope of work includes demo of old controller, installation, wiring, <br />programming, and testing of new controller. New controllers base programming will match the <br />programming of the old controller as much as possible unless otherwise requested by City personnel. <br />Rain Bird controller will also have the capacity for future upgrade to remote control capability, but this <br />was not included in this project due to ongoing costs involved. <br />�A Install a brass flow sensor / master valve assembly capable of detecting an unexpected high flow event <br />(ruptured pipe and responding by shutting off the water supply. Scope includes the installation of the <br />flow sensor, interlock to the master valve, typical trenching requirements and start-up/testing of the new <br />system. If any major issues are discovered during the construction phase while uncovering the existing <br />system, the issues will be compiled in a brief report and submitted to the City for further action. <br />Root Park <br />Lighting <br />Retrofit existing outdoor HID fixtures to new, high -efficiency LED fixtures which will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />Irrigation <br />�Jlr Retrofit existing irrigation controller to Rain Bird weather based irrigation controller. New controller <br />will provide water savings by automatically adjusting station run times based on weather conditions. <br />Weather/evapotranspiration (ET) data will be received by the irrigation controller from an existing, local <br />weather station via radio. Scope of work includes demo of old controller, installation, wiring, <br />programming and testing of new controller. New controller's base programming will match the <br />programming of the old controller as much as possible unless otherwise requested by City personnel. <br />Rain Bird controller will also have the capacity for future upgrade to remote control capability; but this <br />was not included in this project due to ongoing costs involved. <br />p ' City of San Leandro <br />a_ CLIMATECInstallation Agreement —AttA <br />' - Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.