My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
4A Public Hearing 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:04:41 AM
Creation date
5/11/2016 5:29:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-054
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SPECIFIC MEASUREMENT AND VERIFICATION PLAN <br />"OPTION A" <br />FOR LIGHTING SYSTEM UPGRADES <br />Introduction <br />This Measurement and Verification Plan (M&V) is specific to all lighting retrofits and occupancy sensor installations. <br />The sites receiving these upgrades are listed in the Table of Recommended Measures located at the beginning of this <br />Attachment. <br />M&V Protocol <br />For this FEM, IPMVP Protocol — Option A shall be utilized. This option provides for the measurement of at least <br />one variable pre and post retrofit with other variables allowed for stipulation. For this retrofit, a representative sample <br />of each of the fixture types will be measured. The same sample will be used for both pre and post retrofit <br />calculations. Wattage shall be measured with an appropriate instrument that is properly calibrated. <br />Light Levels <br />A representative sample of the light levels shall be measured. Where rooms have similar or identical lighting design, it <br />is not required that each room be measured. Light levels shall be measured by an appropriate instrument that is <br />properly calibrated. Light level measurements apply to both pre and post retrofit areas and shall be recorded at the <br />work surface. Where rooms do not have a specific work surface (such as gymnasiums) light levels shall be measured <br />at the floor. <br />Documentation <br />All areas measured shall be documented. The data shall indicate areas that do not meet IESNA standard light level <br />requirements. All instrumentation used shall be clearly documented. <br />Stipulated Values <br />Operating Hours are stipulated for purposes of M&V. Please see Attachment "C", Lighting Standards of Operation <br />for a complete list of lighting hours of operation. <br />Savings Calculations <br />The calculations for the baseline energy consumption and post retrofit savings provide the basis for the overall <br />financial viability of this FEM. <br />kWh and/or kW Savings <br />The electrical consumption reduction of a particular lighting FEM is determined by comparing the pre and post <br />conditions applied to the hours agreed upon in the Standards of Operation. <br />{[(Existing watts/fixture) x (existing quantity) x (existing hours of operation)] — <br />[(proposed watts/fixture) x (proposed quantity) x (proposed hours of operation)) / 1000 = kWh savings <br />Dollar Savings <br />After calculating the kWh saved, the specific facility's average cost per kilowatt hour shall be used to determine <br />dollar savings. <br />(kWh saved) x (average kWh rate) = $ kWh saved <br />($ kWh saved) = the total dollars saved <br />Attachment A <br />*CLIMATEC' Page 8 of 13 <br />MFRGING BUIL-DINGO & TFC.HNQL-LK!v <br />
The URL can be used to link to this page
Your browser does not support the video tag.