My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
4A Public Hearing 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:04:41 AM
Creation date
5/11/2016 5:29:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-054
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Oyerational Savings <br />The Purchaser will realize maintenance and operational savings resulting from the new lighting system <br />installations, extended warranties, and/or service agreements provided by Climatec LLC. The operational savings <br />are stipulated and met upon the completed installation of the energy retrofit contract. <br />Adjustments <br />For this FEM the following adjustments are allowed for purposes of Measurement and Verification: <br />➢ Light level requirements may be modified as detailed in this plan. <br />➢ Changes in actual construction including number and/or type of fixtures. All changes shall be clearly <br />documented and provided to the Purchaser's representative. <br />➢ Utility rates, billing days or degree days. <br />Commissioning <br />Commissioning shall consist of inspections and a final savings verification report. Inspections shall consist of: <br />➢ During the construction phase of the project, Climatec LLC shall keep a detailed record of the quantity and <br />types of fixtures retrofitted and fixtures installed in each building. A post construction inspection is required <br />by the responsible M&V party. <br />➢ After lighting modifications have been made, the installations shall be inspected to verify the retrofit counts <br />by fixture code. <br />➢ Post retrofit lighting levels shall be measured to verify compliance with the contract standards. <br />Attachment A <br />*CLIMATEC' <br />Page 9 of 13 <br />MERGING BUIL-OI NGS & TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.