My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
8G Consent 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:25:27 AM
Creation date
5/11/2016 5:35:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-055
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: May 16, 2016 <br />aAt� Staff Report <br />File Number: 16-175 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.G. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution to Award a Construction Contract to Souto <br />Brothers Landscaping & Concrete Construction, Inc. for the ADA Transition <br />Plan 14-15, Project No. 2015.0020 <br />SUMMARY AND RECOMMENDATIONS <br />This contract provides for the installation of Americans with Disabilities Act (ADA) compliant <br />concrete walkways, asphalt pavement, landscaping, striping and signage at four City facilities: <br />City Hall, Marina Park, the Marina Community Center and the Main Library. <br />Staff recommends award of a construction contract to the low bidder, Souto Brothers <br />Landscaping & Concrete Construction, Inc., in the amount of $339,950 for the subject project. <br />BACKGROUND <br />In October 2010, the City adopted an ADA Transition Plan with a commitment of $150,000 per <br />annum over a fifteen year period. The transition work is focused on City- owned buildings, <br />parks and recreation facilities. Various facilities were grouped together and programmed into <br />a fifteen year schedule. The current project focuses on outdoor aspects such as ADA parking <br />spaces, path of travel, and curb ramps identified in the Plan located at City Hall, Marina Park, <br />the Marina Community Center, and the Main Library. <br />The project is funded with a portion of the City's annual Community Development Block Grant <br />(CDBG) received from the Federal government, and the General Fund. <br />Analysis <br />A total of three bids were received on April 5, 2016 ranging from $339,950.00 to $464,050.00. <br />Souto Brothers Landscaping & Concrete Construction, Inc. submitted the lowest responsive <br />bid of $339,950.00. As the engineer's pre-bid estimate was $214,525.00, $125,425.00 less <br />than the lowest bid, staff's observation is that current bidding trends point to volatility in project <br />bidding. <br />City of San Leandro Page 1 Printed on 5110/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.