<br />PROJECT TITLE: ADA Transition Plan 14-15
<br />PROJECT NO.: 2015.0020
<br />BID NO.: 15-16-011
<br />BID SUMMARY
<br />is document is a summary of bids received for the subject project and are provided
<br />ly as a convenience. Listing of a particular bid is not a finding that such bid has been
<br />and to be responsive or accepted as complete by the City. An award of contract, if
<br />y, is subject to approval of the City Council and/or the City Manager. Contractors
<br />Duld refer to the contract documents for bidding information.
<br />BID OPENING
<br />DATE: Tuesday, April 4, 2016
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 3/18/16
<br />Prepared by: N. Castelino
<br />Souto Brothers Landscaping
<br />& Concrete Construction, Inc
<br />15934 Hesperian Blvd, #126
<br />San Lorenzo, CA 94580
<br />Phone: (510) 581-4172
<br />FBD Vanguard Construction, Inc.
<br />651 Enterprise Court
<br />Livermore, CA 94550
<br />Phone: (925) 245-1300
<br />Fax: (925) 245-1007
<br />Ray's Electric
<br />411 Pendleton Way, Suite B
<br />Oakland, CA 94621
<br />Phone: (510) 577-7700
<br />Fax: (510) 577-7706
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Mobilization, Traffic and
<br />1 LS
<br />$8,075.00
<br />$8,075.00
<br />$20,600.00
<br />$20,600.00
<br />$6,200.00
<br />$6,200.00
<br />$97,000.00
<br />$97,000.00
<br />Pedestrian Control per Section 9-
<br />3.4
<br />2
<br />Furnish and Install AC Pavement
<br />300 TON
<br />$100.00
<br />$30,000.00
<br />$309.00
<br />$92,700.00
<br />$495.00
<br />$148,500.00
<br />$400.00
<br />$120,000.00
<br />per Section 302-5
<br />3
<br />Striping per Section 310 and 312
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$16,500.00
<br />$16,500.00
<br />$10,500.00
<br />$10,500.00
<br />$17,000.00
<br />$17,000.00
<br />4
<br />Concrete Curb and Gutter per
<br />500 LF
<br />$75.00
<br />$37,500.00
<br />$100.00
<br />$50,000.00
<br />$111.00
<br />$55,500.00
<br />$70.00
<br />$35,000.00
<br />drawing 100 case 3101
<br />5
<br />Concrete Sidewalk (Colored or
<br />3000 SF
<br />$16.00
<br />$48,000.00
<br />$20.00
<br />$60,000.00
<br />$28.20
<br />$84,600.00
<br />$25.00
<br />$75,000.00
<br />Standard to match existing) per
<br />�....
<br />6
<br />.A......:.... 477 ....4nl
<br />Handicap Ramps per drawing 106
<br />2000 SF
<br />$18.00
<br />$36,000.00
<br />$27.00
<br />$54,000.00
<br />$37.45
<br />$74,900.00
<br />$28.00
<br />$56,000.00
<br />case 3101
<br />7
<br />Relocate Signage and Poles per
<br />5 EA
<br />$250.00
<br />$1,250.00
<br />$350.00
<br />$1,750.00
<br />$260.00
<br />$1,300.00
<br />$500.00
<br />$2,500.00
<br />drawing 136 case 3101
<br />8
<br />Landscaping (DG orLawn) per
<br />1 LS
<br />$20,000.00
<br />$20,000.00
<br />$4,250.00
<br />$4,250.00
<br />$5,000.00
<br />$5,000.00
<br />$17,000.00
<br />$17,000.00
<br />Section 308
<br />9
<br />New Signage per drawing 136
<br />1 EA
<br />$200.00
<br />$200.00
<br />$350.00
<br />$350.00
<br />$260.00
<br />$260.00
<br />$450.00
<br />$450.00
<br />case 3101
<br />10
<br />Concrete Handicap Ramp per
<br />400 SF
<br />$22.00
<br />$8,800.00
<br />$26.50
<br />$10,600.00
<br />$50.00
<br />$20,000.00
<br />$30.00
<br />$12,000.00
<br />drawing 106 Case 3101 in
<br />Exposed Aggregate Finish
<br />11
<br />Furnish and Install Concrete
<br />1 EA
<br />$1,000.00
<br />$1,000.00
<br />$2,500.00
<br />$2,500.00
<br />$2,850.00
<br />$2,850.00
<br />$6,600.00
<br />$6,600.00
<br />Bench per plan with Nano Barrier
<br />Grafitti Coating
<br />12
<br />Furnish and Install Headerboard
<br />200 LF
<br />$6.00
<br />$1,200.00
<br />$19.75
<br />$3,950.00
<br />$12.00
<br />$2,400.00
<br />$9.00
<br />$1,800.00
<br />per drawing 440