<br />PROJECT TITLE: ADA Transition Plan 14-15 
<br />PROJECT NO.: 2015.0020 
<br />BID NO.: 15-16-011 
<br />BID SUMMARY 
<br />is document is a summary of bids received for the subject project and are provided 
<br />ly as a convenience. Listing of a particular bid is not a finding that such bid has been 
<br />and to be responsive or accepted as complete by the City. An award of contract, if 
<br />y, is subject to approval of the City Council and/or the City Manager. Contractors 
<br />Duld refer to the contract documents for bidding information. 
<br />BID OPENING 
<br />DATE: Tuesday, April 4, 2016 
<br />TIME: 3:00 p.m. 
<br />LOCATION: City Clerk's Office 
<br />ENGINEER'S ESTIMATE 
<br />Date Approved: 3/18/16 
<br />Prepared by: N. Castelino 
<br />Souto Brothers Landscaping 
<br />& Concrete Construction, Inc 
<br />15934 Hesperian Blvd, #126 
<br />San Lorenzo, CA 94580 
<br />Phone: (510) 581-4172 
<br />FBD Vanguard Construction, Inc. 
<br />651 Enterprise Court 
<br />Livermore, CA 94550 
<br />Phone: (925) 245-1300 
<br />Fax: (925) 245-1007 
<br />Ray's Electric 
<br />411 Pendleton Way, Suite B 
<br />Oakland, CA 94621 
<br />Phone: (510) 577-7700 
<br />Fax: (510) 577-7706 
<br />ITEM 
<br />NO. 
<br />ITEM QUANTITY 
<br />UNIT COST 
<br />ITEM COST 
<br />UNIT COST 
<br />ITEM COST 
<br />UNIT COST 
<br />ITEM COST 
<br />UNIT COST 
<br />ITEM COST 
<br />1 
<br />Mobilization, Traffic and 
<br />1 LS 
<br />$8,075.00 
<br />$8,075.00 
<br />$20,600.00 
<br />$20,600.00 
<br />$6,200.00 
<br />$6,200.00 
<br />$97,000.00 
<br />$97,000.00 
<br />Pedestrian Control per Section 9- 
<br />3.4 
<br />2 
<br />Furnish and Install AC Pavement 
<br />300 TON 
<br />$100.00 
<br />$30,000.00 
<br />$309.00 
<br />$92,700.00 
<br />$495.00 
<br />$148,500.00 
<br />$400.00 
<br />$120,000.00 
<br />per Section 302-5 
<br />3 
<br />Striping per Section 310 and 312 
<br />1 LS 
<br />$10,000.00 
<br />$10,000.00 
<br />$16,500.00 
<br />$16,500.00 
<br />$10,500.00 
<br />$10,500.00 
<br />$17,000.00 
<br />$17,000.00 
<br />4 
<br />Concrete Curb and Gutter per 
<br />500 LF 
<br />$75.00 
<br />$37,500.00 
<br />$100.00 
<br />$50,000.00 
<br />$111.00 
<br />$55,500.00 
<br />$70.00 
<br />$35,000.00 
<br />drawing 100 case 3101 
<br />5 
<br />Concrete Sidewalk (Colored or 
<br />3000 SF 
<br />$16.00 
<br />$48,000.00 
<br />$20.00 
<br />$60,000.00 
<br />$28.20 
<br />$84,600.00 
<br />$25.00 
<br />$75,000.00 
<br />Standard to match existing) per 
<br />�.... 
<br />6 
<br />.A......:.... 477 ....4nl 
<br />Handicap Ramps per drawing 106 
<br />2000 SF 
<br />$18.00 
<br />$36,000.00 
<br />$27.00 
<br />$54,000.00 
<br />$37.45 
<br />$74,900.00 
<br />$28.00 
<br />$56,000.00 
<br />case 3101 
<br />7 
<br />Relocate Signage and Poles per 
<br />5 EA 
<br />$250.00 
<br />$1,250.00 
<br />$350.00 
<br />$1,750.00 
<br />$260.00 
<br />$1,300.00 
<br />$500.00 
<br />$2,500.00 
<br />drawing 136 case 3101 
<br />8 
<br />Landscaping (DG orLawn) per 
<br />1 LS 
<br />$20,000.00 
<br />$20,000.00 
<br />$4,250.00 
<br />$4,250.00 
<br />$5,000.00 
<br />$5,000.00 
<br />$17,000.00 
<br />$17,000.00 
<br />Section 308 
<br />9 
<br />New Signage per drawing 136 
<br />1 EA 
<br />$200.00 
<br />$200.00 
<br />$350.00 
<br />$350.00 
<br />$260.00 
<br />$260.00 
<br />$450.00 
<br />$450.00 
<br />case 3101 
<br />10 
<br />Concrete Handicap Ramp per 
<br />400 SF 
<br />$22.00 
<br />$8,800.00 
<br />$26.50 
<br />$10,600.00 
<br />$50.00 
<br />$20,000.00 
<br />$30.00 
<br />$12,000.00 
<br />drawing 106 Case 3101 in 
<br />Exposed Aggregate Finish 
<br />11 
<br />Furnish and Install Concrete 
<br />1 EA 
<br />$1,000.00 
<br />$1,000.00 
<br />$2,500.00 
<br />$2,500.00 
<br />$2,850.00 
<br />$2,850.00 
<br />$6,600.00 
<br />$6,600.00 
<br />Bench per plan with Nano Barrier 
<br />Grafitti Coating 
<br />12 
<br />Furnish and Install Headerboard 
<br />200 LF 
<br />$6.00 
<br />$1,200.00 
<br />$19.75 
<br />$3,950.00 
<br />$12.00 
<br />$2,400.00 
<br />$9.00 
<br />$1,800.00 
<br />per drawing 440 
<br />ADA Transition Plan 14-15 Page 1 of 2 Printed 4/5/2016 @ 4:14 PM 