FAFJOK <br />. ry <br />PROJECT TITLE: ADA Transition Plan 14-15 <br />PROJECT NO.: 2015.0020 <br />BID NO.: 15-16-011 <br />BID SUMMARY <br />is document is a summary of bids received for the subject project and are provided <br />ly as a convenience. Listing of a particular bid is not a finding that such bid has been <br />and to be responsive or accepted as complete by the City. An award of contract, if <br />y, is subject to approval of the City Council and/or the City Manager. Contractors <br />Duld refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Tuesday, April 4, 2016 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 3/18/16 <br />Prepared by: N. Castelino <br />Souto Brothers Landscaping <br />& Concrete Construction, Inc <br />15934 Hesperian Blvd, #126 <br />San Lorenzo, CA 94580 <br />Phone: (510) 581-4172 <br />FBD Vanguard Construction, Inc. <br />651 Enterprise Court <br />Livermore, CA 94550 <br />Phone: (925) 245-1300 <br />Fax: (925) 245-1007 <br />Ray's Electric <br />411 Pendleton Way, Suite B <br />Oakland, CA 94621 <br />Phone: (510) 577-7700 <br />Fax: (510) 577-7706 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Mobilization, Traffic and <br />1 LS <br />$8,075.00 <br />$8,075.00 <br />$20,600.00 <br />$20,600.00 <br />$6,200.00 <br />$6,200.00 <br />$97,000.00 <br />$97,000.00 <br />Pedestrian Control per Section 9- <br />3.4 <br />2 <br />Furnish and Install AC Pavement <br />300 TON <br />$100.00 <br />$30,000.00 <br />$309.00 <br />$92,700.00 <br />$495.00 <br />$148,500.00 <br />$400.00 <br />$120,000.00 <br />per Section 302-5 <br />3 <br />Striping per Section 310 and 312 <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$16,500.00 <br />$16,500.00 <br />$10,500.00 <br />$10,500.00 <br />$17,000.00 <br />$17,000.00 <br />4 <br />Concrete Curb and Gutter per <br />500 LF <br />$75.00 <br />$37,500.00 <br />$100.00 <br />$50,000.00 <br />$111.00 <br />$55,500.00 <br />$70.00 <br />$35,000.00 <br />drawing 100 case 3101 <br />5 <br />Concrete Sidewalk (Colored or <br />3000 SF <br />$16.00 <br />$48,000.00 <br />$20.00 <br />$60,000.00 <br />$28.20 <br />$84,600.00 <br />$25.00 <br />$75,000.00 <br />Standard to match existing) per <br />�.... <br />6 <br />.A......:.... 477 ....4nl <br />Handicap Ramps per drawing 106 <br />2000 SF <br />$18.00 <br />$36,000.00 <br />$27.00 <br />$54,000.00 <br />$37.45 <br />$74,900.00 <br />$28.00 <br />$56,000.00 <br />case 3101 <br />7 <br />Relocate Signage and Poles per <br />5 EA <br />$250.00 <br />$1,250.00 <br />$350.00 <br />$1,750.00 <br />$260.00 <br />$1,300.00 <br />$500.00 <br />$2,500.00 <br />drawing 136 case 3101 <br />8 <br />Landscaping (DG orLawn) per <br />1 LS <br />$20,000.00 <br />$20,000.00 <br />$4,250.00 <br />$4,250.00 <br />$5,000.00 <br />$5,000.00 <br />$17,000.00 <br />$17,000.00 <br />Section 308 <br />9 <br />New Signage per drawing 136 <br />1 EA <br />$200.00 <br />$200.00 <br />$350.00 <br />$350.00 <br />$260.00 <br />$260.00 <br />$450.00 <br />$450.00 <br />case 3101 <br />10 <br />Concrete Handicap Ramp per <br />400 SF <br />$22.00 <br />$8,800.00 <br />$26.50 <br />$10,600.00 <br />$50.00 <br />$20,000.00 <br />$30.00 <br />$12,000.00 <br />drawing 106 Case 3101 in <br />Exposed Aggregate Finish <br />11 <br />Furnish and Install Concrete <br />1 EA <br />$1,000.00 <br />$1,000.00 <br />$2,500.00 <br />$2,500.00 <br />$2,850.00 <br />$2,850.00 <br />$6,600.00 <br />$6,600.00 <br />Bench per plan with Nano Barrier <br />Grafitti Coating <br />12 <br />Furnish and Install Headerboard <br />200 LF <br />$6.00 <br />$1,200.00 <br />$19.75 <br />$3,950.00 <br />$12.00 <br />$2,400.00 <br />$9.00 <br />$1,800.00 <br />per drawing 440 <br />ADA Transition Plan 14-15 Page 1 of 2 Printed 4/5/2016 @ 4:14 PM <br />