My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
8G Consent 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:25:27 AM
Creation date
5/11/2016 5:35:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-055
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-175 <br />Appropriation <br />Account No. Amount <br />165-18-005 $225,000.00 <br />165-43-235 $ 54,001.81 <br />165-43-237 $116,983.00 <br />210-18-005 $ 95,000.00 <br />Total Appropriation $490,984.81 <br />Available funds for this project as of April 21, 2016 are as follows: <br />Account No. <br />165-18-005 <br />165-43-235 <br />165-43-237 <br />210-18-005 <br />Total <br />Amount <br />$196,176.82 <br />$ 17,108.64 <br />$116,983.00 <br />$ 94,741.44 <br />$425,009.90 <br />Total Estimated Cost of Project $449,940.00 <br />Design, Bid and Award Costs Already Spent $ 40,000.00 <br />Cost of Contract $339,950.00 <br />Remaining for Staff Costs and Contingency during Construction $ 45,059.90 <br />ATTACHMENT <br />Bid Summary <br />PREPARED BY: Nicole Noronha Castelino, Associate Engineer, Engineering and <br />Transportation Department <br />City of San Leandro Page 3 Printed on 5110/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.