My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
8J Consent 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 10:19:08 AM
Creation date
5/11/2016 5:36:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-057
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-108 <br />·On March 21, 2016, by Resolution 2016-037, the City Council Approved an Increase in the <br />Construction Contract Change Order Cap from 40% to 41.2% (from $97,054 to $99,960). <br />Applicable General Plan Policies <br />This project is consistent with General Plan Goal No. 52.07 to provide for the ongoing <br />maintenance of City-owned facilities. <br />Permits and/or Variances Granted <br />A City of San Leandro Building Permit was obtained for this work. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) - Existing Facilities. A CEQA Categorical Exemption for this project was <br />filed with Alameda County on March 26, 2010. <br />Code Compliance Review <br />A City of San Leandro Building Permit was obtained for this project under the 2013 San <br />Leandro Building Code based on the 2012 International Building Code. <br />Summary of Public Outreach Efforts <br />This project was posted on the City’s website and advertised in the Daily Review on August 7, <br />2014. Notification of this bid opportunity was also sent to local Builder’s Exchanges as well as <br />contractors who registered with the City to be informed of bidding opportunities. <br />Fiscal Impacts <br />The total project cost is $517,562.00, which includes design, construction management, <br />inspection, and construction. <br />A summary of the purchase order with Southland Construction is listed below: <br />Original Contract: $242,634.00 <br />Change Orders: $99,959.16 <br />Total Contract Amount: $342,593.16 <br />The largest change order item was for rebuilding the front walls of the restroom and team <br />locker rooms, including siding and windows, as extensive dry rot was discovered during <br />demolition. The cost for this additional construction was approximately $61,000. Other <br />change order costs were related to installing plywood ceilings, floor drain trap primers, interior <br />wall framing and other miscellaneous revisions. <br />Budget Authority <br />Page 2 City of San Leandro Printed on 5/10/2016
The URL can be used to link to this page
Your browser does not support the video tag.