My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
8K Consent 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:37:28 AM
Creation date
5/11/2016 5:36:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-058
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2. Work, Satisfaction of City Engineer. All of the work on the required improvements is to be <br />done at the places, with the materials, in the manner, and at the grades, all as shown upon the approved <br />plans and specifications, and to the reasonable satisfaction of the City Engineer. <br />3. Work; Inspections; Fees. The City Engineer or his designee shall inspect all of the <br />improvements made pursuant hereto to determine that they comply with all City regulations. Concurrently <br />with the execution of this agreement, the Owner shall deposit with the City the sum of Fifty Thousand <br />DOLLARS ($50,000.00) to cover the cost of plan review and inspection of the improvements. Owner <br />hereby agrees to increase the amount of the deposit to pay City the actual cost of inspection if such costs <br />should exceed the original deposit. <br />4. Modification for Unforeseeable Circumstances. Owner reserves the right to modify said <br />plans and specifications as the development progresses should unforeseen conditions occur, providing <br />written approval is first obtained from the City Engineer. The City shall bear no responsibility whatsoever <br />for work performed and rejected by the City Engineer. City reserves the right to make reasonable <br />modifications to the plans and specifications whenever field conditions and/or public safety require such <br />modifications. Owner shall pay City for all costs incurred in plan checking and inspection resulting from <br />said modifications. <br />5. Work; Time for Commencement and Performance. City hereby fixes the time for the <br />commencement of the required work to be on or before the 1st day of October 2014, and for its completion <br />to be on the 30'h day of September 2015. At least 15 calendar days prior to the commencement of work <br />hereunder, Owner shall notify the City Engineer in writing of the date fixed by Owner for commencement <br />thereof, in order that the City Engineer shall be able to provide services for inspection. <br />6. Location of Construction Yard. Owner agrees to locate any construction yard for the <br />storage of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used <br />in connection with the installation of improvements for said project or the construction of buildings therein, <br />in such a manner so as to cause a minimum of inconvenience to persons living in the areas immediately <br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.