Consultant shall prepare the 100% PS&E documents to address comments from the Focus Meeting, <br /> Design Coordination Meeting#2 and the Caltrans review of the 70% PS&E. Construction details will be <br /> finalized as part of Task 5. The individual design components shall undergo an in-house review by the <br /> Consultant to check for completeness and compliance to standards to ensure a complete and constructible <br /> design package. Consultant shall conduct additional site investigations prior to completion of the 100% <br /> PS&E to ensure existing conditions are depicted accurately. <br /> The City will submit the 100% PS&E to Caltrans for review if needed. <br /> Deliverables (due 4 weeks after Design Coordination Meeting#2 or receipt of Caltrans review comments <br /> on the 70% PS&E, whichever occurs later): <br /> - 100% plans in PDF and AutoCAD formats. Plans shall be 34"by 22" in size (ANSI D)on City title <br /> block <br /> - 100%technical specifications in Microsoft Word <br /> - 100%cost estimate in Microsoft Excel <br /> Task 6—Final PS&E <br /> Consultant shall prepare the final PS&E documents to address review comments on the 100% PS&E. <br /> Consultant shall conduct a final QA/QC review of the PS&E documents to ensure all design elements are <br /> thoroughly addressed. <br /> Deliverables shall be signed and stamped by the Consultant and/or Subconsultant(due 3 weeks after <br /> Consultant receives review comments on the 100% PS&E): <br /> - Final plans in PDF and AutoCAD formats. Plans shall be 34" by 22" in size(ANSI D) <br /> - Final technical specifications in Microsoft Word <br /> - Final cost estimate in Microsoft Excel <br /> Consulting Services Agreement between City of San Leandro and 3/25/2016 <br /> BKF Engineers Exhibit A—Page 19 of 24 <br />