My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Exploratorium
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Exploratorium
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 11:32:16 AM
Creation date
5/26/2016 11:32:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/1/2015
Retention
PERM
Document Relationships
Agmt 2016 The Exploratorium
(Amended by)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2015-172
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> EXHIBIT A <br /> SCOPE OF SERVICES <br /> San Leandro —Joaquin Plaza <br /> Scope of Work <br /> PHASE II - Fabrication <br /> Scope <br /> The Studio for Public Spaces (SPS)will engage in the design/build process for the Joaquin <br /> Plaza installation in San Leandro. This process will include a final round of prototyping to ensure <br /> the design strategies are met for the desired lifespan of the installation. <br /> Deliverables <br /> Final Prototyping: <br /> • Onsite, full scale prototype <br /> • 1 Community meeting <br /> Design Development: <br /> • Plan and Elevations of Joaquin Plaza Installation <br /> • Design Documentation of Joaquin Plaza Installation Graphics <br /> • Detail and Structural Documentation for permitting <br /> • Preliminary maintenance guidelines and documentation <br /> • <br /> Fabrication: <br /> • Construction Documents of Final Design <br /> • Fabrication and installation of Joaquin Plaza Installation <br /> • Final Maintenance guidelines and documentation <br /> Timeline <br /> October 2015—June 2016 <br /> Fees <br /> Total fees for this scope of work are $235,000 <br /> Consulting Services Agreement between October 1, 2015 <br /> City of San Leandro and Exploratorium—Exhibit A Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.