My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2016 0606
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0606
>
8K Consent 2016 0606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 8:02:13 AM
Creation date
6/2/2016 10:22:27 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/6/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0606 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0606
Reso 2016-066
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-209 <br />Applicable General Plan Policies <br />This action is consistent with Transportation Goal No. 14 of the General Plan and Action Item <br />14.07: Pedestrian Environment. <br />Environmental Review <br />This project was deemed categorically exempt per California Environmental Quality Act <br />(CEQA) Section 15301(c) - Existing Facilities. A Notice of Exemption was filed with the <br />Alameda County Clerk-Recorder’s Office on August 21, 2014 . <br />Summary of Public Outreach Efforts <br />This project was advertised on March 20, 2015 in the Daily Review as well as in three other <br />newspapers whose circulation reflects the diversity of San Leandro. Staff also notified <br />contractors interested in working with the City via email and sent plans to fifteen plan rooms. <br />The contractor provided notification door hangers to properties adjacent to the project <br />immediately before work began. <br />Fiscal Impacts <br />The total cost of this project including design, bid, construction, inspection, and construction <br />administration is $1,041,000. The construction cost for the installation of the bicycle lockers at <br />San Leandro BART Station by eLock Technologies, LLC was $93,854.94. <br />eLock Technologies Contract $ 93,854.94 <br />McGuire and Hester Contract 762,800.00 <br />McGuire and Hester Contract Change 47,000.00 <br /> Total McGuire and Hester Contract:$ 809,800.00 <br />Staff, Inspection, Design, Bid, Contract Administration 137,345.06 <br />Total Cost $1,041,000.00 <br />Budget Authority <br />This project has been funded as follows: <br />·$110,000 Measure B Bicycle and Pedestrian funds in account 144-36-294 appropriated <br />as part of the Fiscal Year 2010-11 budget and via Resolution No. 2016-045. <br />·$346,000 Measure B project funds in account 144-39-023 appropriated via Resolution <br />No. 2013-087. <br />·$40,000 Regional Measure 2 grant funds in account 150-36-294 appropriated via <br />Resolution No. 2013-131. <br />·$360,000 Regional Measure 2 grant funds in account 150-36-294 appropriated via <br />Resolution No. 2015-170. <br />·$70,000 TFCA grant funds in account 150-38-364 appropriated via Resolution No. <br />2014-100. <br />·$115,000 Measure B Funds, Local Streets and Roads, Account No. 144-38-384, <br />Page 3 City of San Leandro Printed on 6/1/2016
The URL can be used to link to this page
Your browser does not support the video tag.