My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Reso 2000-009
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
RDA Reso 2000-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 3:49:11 PM
Creation date
6/3/2016 3:49:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/6/2000
Retention
PERM
Document Relationships
7C New Business 2000 0306
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E (Initial Study/Part 10 S Page 9 <br /> 6. a., b. The project site is located in an urban area which is completely developed with retail, <br /> manufacturing, other automobile dealerships, and auto-related services. Marina Boulevard is a <br /> major arterial and exists as a 4-6 lane divided roadway in the vicinity of the project site. <br /> Typically, the only potentially significant noise generated by an automobile dealership is the <br /> noise associated with servicing of vehicles (air compressors, hydraulic equipment, etc.) The <br /> service bays are proposed to be located at the rear of the project site, within the two existing <br /> metal buildings that will remain. There are no sensitive noise receptors in the vicinity of the <br /> project. Redevelopment of the site with an automobile dealership is not anticipated to result in <br /> any significant noise impacts. <br /> Noise is regulated in San Leandro through the noise ordinance, which can consider the level, <br /> intensity, character, and duration of the noise as well as the time and place of the noise in <br /> determining whether the ordinance has been violated. <br /> Short-term construction noise impacts would occur during demolition, site preparation and <br /> construction. All construction activities would be required to comply with applicable City noise <br /> standards and regulations in any plan check conditions for the site. Implementation of this standard <br /> condition would bring the impact to a less than significant level. <br /> Hours of construction will be limited to Monday through Friday from 7:00 a.m. to 6:00 p.m., and <br /> Saturday from 8:00 a.m.to 5:00 p.m.. No construction is permitted on Sunday. <br /> 7. The construction of a new automobile dealership would include the placement of lighting <br /> standards throughout the property. New forms of light and glare associated with on-site uses will <br /> also include interior nighttime lighting of the showroom and display vehicle areas. While the <br /> proposed change in land use would likely result in a moderate increase in the amount of glare <br /> produced on-site during the evening hours (the site is currently developed, with on-site lighting), <br /> the additional light and glare would not be substantial given current retail, commercial, and <br /> industrial lighting in the project vicinity. As a standard condition of approval, all new lighting <br /> shall be designed and equipped with shields to eliminate off-site glare. Implementation of this <br /> standard condition would bring the impact to a less than significant level. <br /> 8. The proposal to develop an automobile dealership on property that is currently developed with <br /> food manufacturing uses (former Safeway Preserves Plant) represents a change in the existing <br /> land use. The property is zoned IG-Industrial General with an S-Overlay. Automobile dealership <br /> uses are permitted under this district. The appropriate infrastructure is available to connect <br /> future improvements with existing utility lines as this is an in-fill location. <br /> 10. a. e. The applicant has prepared a Preliminary Environmental Site Assessment (ESA) and an <br /> Asbestos Survey Report'. The existing facility (vacated by Safeway approximately two years <br /> 9 <br /> 1 Preliminary Environmental Site Assessment—Safeway Preserves Plant, 1111 Marina Boulevard,San Leandro, <br /> California 94577,prepared by Entrix,Inc.,January 2000;Asbestos Survey Report—Former Safeway Property, <br /> 1111 Marina Boulevard,San Leandro,California,prepared by Converse Consultants,January 18,2000.Both <br /> reports are on file at the City of San Leandro,Development Services Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.