My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 Mark Thomas and Company Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 Mark Thomas and Company Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 6:26:34 PM
Creation date
6/7/2016 6:26:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/6/2016
Retention
PERM
Document Relationships
Reso 2016-065
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Project Description <br /> The City is working toward a redevelopment and revitalization of its shoreline. A new development <br /> near the existing marina is envisioned to create a first class location to live, work, and play that <br /> includes office buildings, townhomes, and recreation opportunities. Considering that a golf course <br /> and public park are already in place, the addition of the new development will create a popular and <br /> enjoyable destination on the western edge of town. This project will improve Marina Boulevard, <br /> the main access to the shoreline, with the aim of creating an entryway commensurate with the <br /> quality of the opportunities that will exist in the new development and a memorable statement that <br /> lets visitors know they are arriving at one of the great destinations along the San Francisco Bay. <br /> The project area consists of Marina Boulevard between Merced Street and Monarch Bay Drive, <br /> divided into two related but independent segments. Segment one limits are between Monarch Bay <br /> Drive and Doolittle Drive and Segment two limits are between Doolittle Drive and Merced Street. <br /> Streetscape improvements to Marina Boulevard are generally envisioned to consist of sidewalk <br /> improvements, ADA ramp upgrades, bulb outs, landscaping, monument signs, medians, new fire <br /> hydrants, street lighting, signage,undergrounding of utilities, and AC pavement rehabilitation. <br /> This contract is for consulting services related to development of conceptual street improvement <br /> plans for Marina Boulevard as described below. <br /> Task 1 —Project Management <br /> Consultant shall manage his work under this contract in manner consistent with the <br /> standards observed by a competent practitioner of the profession in which Consultant is <br /> engaged. <br /> Task 2—Topographic Survey <br /> Prepare a topographic survey suitable for design of construction documents that maps the <br /> existing physical conditions and infrastructure within the project area. Survey area shall be <br /> from the western crosswalk of Marina Blvd at Merced Street to 100' west of the western <br /> curb line of Neptune Drive, extending the full width of the public right of way over the <br /> entire length. <br /> Survey shall include all above ground improvements as well as locations of underground <br /> utilities. Improvements to be mapped include monuments, utility valves, manholes, and <br /> inlets, storm drains, sewer lines, sidewalks, street trees or wells, street lights/signals, signage <br /> and poles, roadway striping, driveways, bus stops. Location and elevation shots shall be <br /> taken at high points, low points, and grade breaks. Other items determined to be of <br /> Consulting Services Agreement between City of San Leandro and <br /> Mark Thomas and Company, Inc.for Marina Boulevard Streetscape Exhibit A—Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.