My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2016 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0620
>
8M Consent 2016 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 1:11:36 PM
Creation date
6/14/2016 4:00:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Agmt 2016 4Leaf
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 AHG Architectural
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 TRB + Associates
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Plan Review Services <br />4LEAF will provide plan review for any and all types of structures to ensure compliance with all adopted codes, <br />local ordinances (including Tier 1 of Cal Green, if required) and state and federal laws that pertain to Building <br />and Safety, and for compliance with the adopted International Code Council (ICC) building, plumbing, electrical, <br />mechanical, and fire codes, and the accessibility and Noise and Energy Conservation requirements as mandated <br />by the State of California Title 24, State of California Water Efficient Landscape Ordinance, the State of California <br />Certified Access Specialist (CASp) compliance, and all other applicable ordinances. Types of projects we provide <br />these services for include; Single‐family Dwellings, Multi‐family Dwelling Units, Commercial, and Industrial. <br /> <br />On‐Site Review Work Plan <br />4LEAF can supply Registered Professional Engineers to the City of San Leandro to work on‐site performing <br />structural plan review and non‐structural reviews at the Jurisdiction’s discretion. 4LEAF currently supplies on‐ <br />site review to such Municipalities as: <br /> <br />City of San Jose City of Palo Alto City <br />of Gilroy City of San Mateo <br />City of Livermore City of Pleasanton <br />City of Hollister City of East Palo Alto <br />Livermore/Pleasanton Fire Dept. (LPFD) City of Roseville <br />City of Sacramento County of San Joaquin <br /> <br />Off‐Site Review Work Plan <br />4LEAF is able to work effectively with design teams and assist Public Works, Planning, Fire, and Building <br />Departments in the construction, rehabilitation, and repair of both public and private projects. Our experience <br />includes checking for compliance with the structural, life‐safety, accessibility, plumbing, mechanical, electrical, <br />fire, and local codes/ordinances. <br /> <br />Plan Review Approach <br />We understand that the specific Building Plan Review responsibilities will include, but are not limited to: <br />• Examining plans, drawings, specifications, computations documents, soils reports, and any additional <br />data; <br />• Ascertaining whether projects are in accordance with applicable building and fire codes, and City <br />ordinances, including but not limited to Title 24 and Title 25; <br />• Performing such reviews as, Structural, MEP, green building, fire and life safety, grading and drainage; <br />• Reviewing plans to ensure conformity to the required strengths, stresses, strains, loads, and stability as <br />per the applicable laws; <br />• Reviewing plans to ensure conformity with use and occupancy classification, general building heights <br />and areas; types of construction; fire resistance construction and protection systems; means of egress; <br />accessibility; structural design; soils and foundations; and masonry; <br />• Providing additional plan review services as requested by the City; <br />• Conducting all plan review at the City Department or, as needed, at a site mutually agreed upon in <br />writing and; <br />• Supplying all plan review staff with all code books and other basic professional references.
The URL can be used to link to this page
Your browser does not support the video tag.