My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2016134990
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2016
>
Inst 2016134990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 5:02:01 PM
Creation date
6/20/2016 5:01:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/2/2016
Recorded Document Type
_Other
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT NO. 1989.014.05 <br /> , City of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 2 <br /> (4) Replace 1,200 cubic yards of undersized riprap and earthen material with <br /> 1,200 cubic yards of 12-inch rock riprap over a 23,950-square-foot area along <br /> the north dike (original authorization); <br /> (5) Berth a maximum of 15 live-aboard boats (original authorization); <br /> (6) Install new utilities to serve the berths (original authorization); <br /> (7) Stabilize the pile-supported harbormaster office by driving eight timber <br /> batter piles (original authorization); <br /> (8) Relocate 15 channel markers to correspond more closely to the width of the <br /> navigation channel that leads to the marina (original authorization); <br /> (9) Remove timber gangways at piers J, K L/M, N/O and P/C., the Harbor- <br /> Master's office at Pier A, and the fuel dock of the west dike, and replace all <br /> but the fuel dock gangway with new aluminum gangways, with a net <br /> decrease of Bay fill of 54 square feet (Amendment One); <br /> (10) Place and maintain approximately 2,900 square feet (230 cubic yards) of new <br /> riprap primarily along the southwest edge of Marina Park in Laguna Del Sol; <br /> the site is identified as "Work Area D" in Exhibit D (Amendment <br /> No. Four); and <br /> (11) Maintain on an in-kind, as needed basis, until the year 2010, all existing <br /> facilities within the San Leandro Marina and shoreline as described in Item <br /> I.A. above, along the north, south, east and west dikes, including the <br /> replacement riprap authorized in Amendment No. Four (see Exhibits C, D, <br /> and E) (original authorization). <br /> b. Shoreline Marshlands Enhancement Project(Water Circulation and Drainage <br /> Plan) <br /> (1) Dredge approximately 2,585 cubic yards of material from Roberts Landing <br /> Slough and dispose the material outside the Commission's jurisdiction <br /> (Amendment Two); <br /> (2) Extend Roberts Landing Slough to San Lorenzo Creek by dredging <br /> approximately 9,545 cubic yards of material and dispose the material outside <br /> the Commission's jurisdiction (Amendment Two); <br /> (3) Install four 48-inch culverts with tidegates and associated shoreline <br /> protection in the North Marsh shoreline levee, covering approximately 1,150 <br /> square feet of Bay surface area (Amendment Two); <br />
The URL can be used to link to this page
Your browser does not support the video tag.