Laserfiche WebLink
rt <br /> PERMIT NO. 1989.014.05 <br /> City of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 3 <br /> (4) Install one 24-inch culvert with a screw gate and associated shoreline <br /> protection in the southern levee of East Marsh, covering approximately 120 <br /> square feet of Bay surface area, and repair the existing tidegate along San <br /> Lorenzo Creek (Amendment Two); <br /> (5) Place approximately 2,900 square feet of rock riprap along a 420-foot length <br /> of shoreline to stabilize and protect the existing Bunker Marsh levee road <br /> (Amendment Two); and <br /> (6) Remove approximately 250 cubic yards of woody debris from Roberts <br /> Landing Slough (Amendment Two). <br /> 2. Within the 100-foot Shoreline Band: <br /> a. Marina Facilities Replacement Project <br /> (1) Replace 400 cubic yards of undersized riprap and earthen material with <br /> 400 cubic yards of riprap over a 6,000-square-foot area along the north dike <br /> (original authorization); <br /> (2) Remove 13,975 square feet of asphalt pathway, and install a 10-foot-wide by <br /> 940-foot-long concrete pedestrian path along the north dike, and a 575-foot- <br /> long concrete path along the west dike, a portion of which is 9 feet wide and <br /> a portion 6.5 feet wide (original authorization); <br /> (3) Landscape and irrigate a 20,500-square-foot area (original authorization); <br /> (4) Install public access amenities including benches, drinking fountains, and <br /> bollard lights (original authorization); and <br /> (5) Replace and maintain on an in-kind, as needed basis, until the year 2010, all <br /> existing facilities within the San Leandro Marina and shoreline, as described <br /> in Item I.A. above, along the north, south, east and west dikes (original <br /> authorization). <br /> b. Shoreline Marshlands Enhancement Project(Water Circulation and Drainage <br /> Plan) <br /> (1) Install four 48-inch culverts in the North Marsh levee, covering approximately <br /> 1,050 square feet (Amendment Two); <br /> (2) Install one 24-inch culvert in the East Marsh levee, covering approximately <br /> 215 square feet (Amendment Two); <br /> (3) Improve approximately 900 linear feet of levee on east side of Roberts <br /> Landing Slough, raising the levee elevation by 2 to 3 feet (Amendment Two); <br />