Laserfiche WebLink
File Number: 16-327 <br />and September 16, 2015. <br />. <br />Fiscal Impacts <br />The total project cost was $255,000.00, which included design, construction management, <br />inspection, and construction. <br />A summary of the construction contract with Breneman, Inc. is listed below: <br />Original Contract: $192,218.50 <br />Change Orders: $ 1,369.50 <br />Total Contract Amount: $193,588.00 <br />Budget Authority <br />This project is funded through the following appropriation: <br />·$190,000.00 from Special Grants Fund in account 150-62-117 <br />·$65,000.00 Park Development Fees in 122-62-117 <br />ATTACHMENT(S) <br />·Post-construction photographs - Thrasher Park Play Equipment <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 7/13/2016 <br />216