My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2016 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0718
>
8L Consent Calendar 2016 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 3:50:06 PM
Creation date
7/15/2016 3:49:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2016
Retention
PERM
Document Relationships
Reso 2016-101
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4.3 Additional Progress Assessments <br />The City of San Leandro will be doing quarterly visual assessments of randomly selected <br />blocks in each TMA and Sub Designation. These assessments will include photographic <br />evidence and the data will feed a database designed to indicate the success of <br />existing and planned control measures. These assessments will be instituted in the 2014- <br />15 fiscal year. <br />4.4 Long-Term Assessment Strategy <br />The City of San Leandro is committed to implementing standardized assessment <br />methods post-FY 2016/17 based on the lessons learned from pilot assessments. <br />Assessment activities described in the previous sections will evaluate the utility of <br />different assessment methods to demonstrate progress towards trash reduction targets <br />and provide recommended approaches for long-term implementation. Lessons <br />learned will be submitted to the Water Board with the FY 2015-2016 Annual Report and <br />a revised Strategy will be developed and submitted, if necessary. The revised Strategy <br />will include assessment methods that will be used to demonstrate progress during the <br />remaining term of trash reduction requirements. <br />4.5 Implementation Schedule <br />The implementation schedule for the ACCWP Pilot Implementation Strategy, BASMAA’s <br />Tracking California’s Trash project, and the Long-Term Assessment Strategy are included <br />in Table 4-1. Load reduction reporting milestones are also denoted in the table. The <br />schedule is consistent with the need for near-term pilot assessment results to <br />demonstrate progress toward short-term targets, while acknowledging the need for <br />testing and evaluation of assessment methods and protocols prior to long-term <br />implementation. <br />361
The URL can be used to link to this page
Your browser does not support the video tag.