Laserfiche WebLink
SAN LEANDRO GENERAL PLAN UPDATE FINAL EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact N/A = Not Applicable <br />PLACEWORKS 2-15 <br />TABLE 2-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Impact <br />Significance <br />before <br />Mitigation Mitigation Measures <br />Significance <br />after <br />Mitigation <br />SVCS-8: The proposed project would not increase the use <br />of existing neighborhood and regional parks or other <br />recreational facilities, such that substantial physical <br />deterioration of the facility would occur, or be <br />accelerated. <br />LTS N/A N/A <br />SVCS-9: The proposed project would not include <br />recreational facilities or require the construction or <br />expansion of recreational facilities which might have an <br />adverse physical effect on the environment. <br />LTS N/A N/A <br />SVCS-10: The proposed project, in combination with past, <br />present and reasonably foreseeable projects, would result <br />in less-than-significant cumulative impacts with respect to <br />parks and recreation facilities. <br />LTS N/A N/A <br />SVCS-11: The proposed project would not result in the <br />need for new or physically altered public facilities, the <br />construction of which could cause significant <br />environmental impacts, in order to maintain acceptable <br />service ratios, or other performance objectives. <br />LTS N/A N/A <br />SVCS-12: The proposed project, in combination with past, <br />present and reasonably foreseeable projects, would result <br />in less-than-significant cumulative impacts with respect to <br />the construction of other public facilities. <br />LTS N/A N/A <br />TRANSPORTATION AND TRAFFIC <br />TRAF-1: Implementation of the Proposed Plan, in <br />combination with regional growth outside of San Leandro, <br />would result in increased vehicle traffic, which would <br />affect the operations of local intersections and freeway <br />segments. <br /> As shown in Table 4.13-11 4.13-15, the addition of <br />proposed Plan traffic would result in significant <br />impacts to 12 15 intersections during at least one of <br />the peak hours. <br /> As shown in Table 4.13-12 4.13-16 and Table 4.13-13 <br />4.13-17, the addition of proposed Plan traffic would <br />result in significant impacts to seven eight freeway <br />S TRAF-1A: Intersections: The City of San Leandro should implement <br />the following traffic improvements and facilities to reduce impacts <br />to standard: <br /> E. 14th Street and Davis Street (SR-112) (#3): The addition of <br />Cumulative with proposed Plan traffic would cause the <br />intersection level of service to degrade from LOS C to LOS F in the <br />AM peak hour. Therefore, the Cumulative with Proposed Plan <br />impact is considered to be significant. <br />Implementation of the following measures would improve <br />intersection operations during the AM peak hour to LOS D: <br /> Add an additional northbound left-turn lane on E. 14th Street. <br />This would result in the northbound approach having two <br />SU